My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 & 1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901 & 1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:06:10 PM
Creation date
6/23/2022 1:30:55 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1919 N Fairview St
Street Number
1901
1919
Street Direction
N
N
Street Name
Fairview
Fairview
Street Suffix
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEIGHTON CONSULTING, INC. <br />General Earthwork and Grading Spedfications <br />7.2 Bedding and Backfill <br />All bedding and backfill of utility trenches shall be performed in accordance with <br />the applicable provisions of Standard Specifications of Public Works <br />Construction. Bedding material shall have a Sand Equivalent greater than 30 <br />(SID>30). The bedding shall be placed to I foot over the top of the conduit and <br />densified by jetting. Backfill shall be placed and densified to a minimum of <br />90 percent of relative compaction from 1 foot above the top of the conduit to the <br />surface. <br />The Geotechnical Consultant shall test the trench backfill for relative compaction. <br />At least one test should be made for every 300 feet of trench and 2 feet of fill. <br />7.3 Lift Thickness <br />Lift thickness of trench backfill shall not exceed those allowed in the Standard <br />Specifications of Public Works Construction unless the Contractor can <br />demonstrate to the Geotechnical Consultant that the fill lift can be compacted to <br />the minimum relative compaction by his alternative equipment and method. <br />7.4 Observation and Testing <br />The jetting of the bedding around the conduits shall be observed by the <br />Geotechnical Consultant. <br />F-7 <br />SL Rvcd 2019.01.21
The URL can be used to link to this page
Your browser does not support the video tag.