My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 & 1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901 & 1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 1:31:30 PM
Creation date
6/23/2022 1:30:55 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1919 N Fairview St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
603284-001 <br />The above section assumes Category 3 subgrade with good drainage <br />characteristics and an R-value of at least 30 compacted to at least 95 <br />percent relative compaction based on ASTM Test Method D 1557-10. <br />Representative samples of the actual subgrade materials should be <br />obtained and tested for R-Value following rough grading of the pavement <br />subgrade to confirm the pavement design sections. <br />5.8 Temporarv Excavation and Shorinq Design <br />All temporary excavations, including utility trenches, retaining wall excavations <br />and foundation excavations should be performed in accordance with project <br />plans, specifications, and all OSHA requirements. Excavations 5 feet or deeper <br />should be laid back or shored in accordance with OSHA requirements before <br />personnel are allowed to enter. <br />No surcharge loads should be permitted within a horizontal distance equal to the <br />height of cut or 5 feet, whichever is greater from the top of the cut, unless the cut <br />is shored appropriately. Excavations that extend below an imaginary plane <br />inclined at 45 degrees below the edge of any adjacent existing site foundation <br />should be properly shored to maintain support of the adjacent structure. <br />Typical cantilever shoring should be designed based on the active fluid pressure <br />presented in Section 5.5. If excavations are braced at the top and at specific <br />design intervals, the active pressure may then be approximated by a rectangular <br />soil pressure distribution with the pressure per foot of width equal to 25H, where <br />H is equal to the depth of the excavation being shored. <br />During construction, the soil conditions should be regularly evaluated to verify <br />that conditions are as anticipated. The contractor should be responsible for <br />providing the "competent person" required by OSHA, standards to evaluate soil <br />conditions.Close coordination between the competent person and the <br />geotechnical engineer should be maintained to facilitate construction while <br />providing safe excavations. <br />5.9 Additional Geotechnical Services <br />The geotechnical recommendations presented in this report are based on <br />subsurface conditions as interpreted from limited subsurface explorations and <br />31- <br />Leighton <br />SL Rvcd 2019.01.21
The URL can be used to link to this page
Your browser does not support the video tag.