My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901-1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901-1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:07:26 PM
Creation date
6/23/2022 1:32:37 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1902 N Fairview St
1903 N Fairview St
1904 N Fairview St
1905 N Fairview St
1906 N Fairview St
1907 N Fairview St
1908 N Fairview St
1909 N Fairview St
1910 N Fairview St
1911 N Fairview St
1912 N Fairview St
1913 N Fairview St
1914 N Fairview St
1915 N Fairview St
1916 N Fairview St
1917 N Fairview St
1918 N Fairview St
1919 N Fairview St
Street Number
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
Street Direction
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Leighton Consulting, Inc. <br />A LEIGHTON GROUP COMPANY <br />December 2, 2011 <br />Project No. 603284-001 <br />To:Griffin Structures <br />385 Second Street <br />Laguna Beach, California 92651 <br />Attention:Mr. Deryl Robinson, Vice President Griffin Structures <br />Subject:Geotechnical Exploration Report <br />Proposed Charter High School and Group Home <br />1901 and 1919 North Fairview Street <br />Santa Ana, California <br />Per your request, Leighton Consulting, Inc. has performed geotechnical exploration for a <br />proposed charter high school and group home at 1901 and 1919 North Fairview Street in the <br />City of Santa Ana, California. The purpose of this study was to characterize subsurface <br />conditions, evaluate geologidseismic hazards impacting the site, and develop <br />recommendations for design and construction of the project. The results of our exploration <br />indicate that the project is deemed feasible from a geotechnical perspective. Our findings, <br />conclusions, and recommendations are presented in the attached report. <br />We appreciate the opportunity to work with you on this project. If you have any questions, or if <br />we can be of further service, please contact us at your convenience. <br />Respectfully submitted, <br />LEIGHTON CONSULTING, INC. <br />Q*€- <br />Joe Roe, CEG 2456 <br />Project Geologist <br />JAR/CCK/Ir <br />#P JOE A A <br />ROE / No, 2466 <br />MUI CERTIFIED -411 <br />1 ENGINEERING #1* GEOLOGIST 0 <br />C./932- 4% <br />Carl C. Kim, GE 2620 <br />Vice President <br />Distribution: (3) Addressee <br />17781 Cowan I Irvine, CA 92614-6009 <br />949.253.9836 I Fax 949.250.1114 I www. leightongroup.com
The URL can be used to link to this page
Your browser does not support the video tag.