My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901-1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901-1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:07:26 PM
Creation date
6/23/2022 1:32:37 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1902 N Fairview St
1903 N Fairview St
1904 N Fairview St
1905 N Fairview St
1906 N Fairview St
1907 N Fairview St
1908 N Fairview St
1909 N Fairview St
1910 N Fairview St
1911 N Fairview St
1912 N Fairview St
1913 N Fairview St
1914 N Fairview St
1915 N Fairview St
1916 N Fairview St
1917 N Fairview St
1918 N Fairview St
1919 N Fairview St
Street Number
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
Street Direction
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEIGHTON CONSULTING, INC. <br />General Earthwork and Grading Spedfications <br />4.2 Fill Moisture Conditioning <br />Fill soils shall be watered, dried back, blended, and/or mixed, as necessary to <br />attain a relatively uniform moisture content at or slightly over optimum. <br />Maximum density and optimum soil moisture content tests shall be performed in <br />accordance with the American Society of Testing and Materials (ASTM Test <br />Method D1557-91). <br />4.3 Compaction ofFill <br />After each layer has been moisture-conditioned, mixed, and evenly spread, it shall <br />be uniformly compacted to not less than 90 percent of maximum dry density <br />(ASTM Test Method D 1557-91). Compaction equipment shall be adequately <br />sized and be either specifically designed for soil compaction or of proven <br />reliability to efficiently achieve the specified level of compaction with uniformity. <br />4.4 Compaction of Fill Slopes <br />In addition to normal compaction procedures specified above, compaction of <br />slopes shall be accomplished by backrolling of slopes with sheepsfoot rollers at <br />increments of 3 to 4 feet in fill elevation, or by other methods producing <br />satisfactory results acceptable to the Geotechnical Consultant. Upon completion <br />of grading, relative compaction of the fill, out to the slope face, shall be at least <br />90 percent ofmaximum density per ASTM Test Method D1557-91. <br />4.5 Compaction Testing <br />Field-tests for moisture content and relative compaction of the fill soils shall be <br />performed by the Geotechnical Consultant. Location and frequency of tests shall <br />be at the Consultant's discretion based on field conditions encountered. <br />Compaction test locations will not necessarily be selected on a random basis. Test <br />locations shall be selected to verify adequacy of compaction levels in areas that <br />are judged to be prone to inadequate compaction (such as close to slope faces and <br />at the filFbedrock benches). <br />4.6 Frequency of Compaction Testing <br />Tests shall be taken at intervals not exceeding 2 feet in vertical rise and/or <br />1,000 cubic yards of compacted fill soils embankment. In addition, as a guideline, <br />at least one test shall be taken on slope faces for each 5,000 square feet of slope <br />face and/or each 10 feet of vertical height of slope. The Contractor shall assure <br />that fill construction is such that the testing schedule can be accomplished by the <br />Geotechnical Consultant. The Contractor shall stop or slow down the earthwork <br />construction ifthese minimum standards are not met. <br />F-5
The URL can be used to link to this page
Your browser does not support the video tag.