My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901-1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901-1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:07:26 PM
Creation date
6/23/2022 1:32:37 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1902 N Fairview St
1903 N Fairview St
1904 N Fairview St
1905 N Fairview St
1906 N Fairview St
1907 N Fairview St
1908 N Fairview St
1909 N Fairview St
1910 N Fairview St
1911 N Fairview St
1912 N Fairview St
1913 N Fairview St
1914 N Fairview St
1915 N Fairview St
1916 N Fairview St
1917 N Fairview St
1918 N Fairview St
1919 N Fairview St
Street Number
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
Street Direction
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEIGHTON CONSULTING, INC. <br />General Earthwort and Grading Spedfications <br />7.2 Bedding and Backfill <br />All bedding and backfill of utility trenches shall be performed in accordance with <br />the applicable provisions of Standard Specifications of Public Works <br />Construction. Bedding material shall have a Sand Equivalent greater than 30 <br />(SE>30). The bedding shall be placed to 1 foot over the top of the conduit and <br />densified by jetting. Backfill shall be placed and densified to a minimum of <br />90 percent of relative compaction from 1 foot above the top of the conduit to the <br />surface. <br />The Geotechnical Consultant shall test the trench backfill for relative compaction. <br />At least one test should be made for every 300 feet of trench and 2 feet of fill. <br />7.3 Lift Thickness <br />Lift thickness of trench backfill shall not exceed those allowed in the Standard <br />Specifications of Public Works Construction unless the Contractor can <br />demonstrate to the Geotechnical Consultant that the fill lift can be compacted to <br />the minimum relative compaction by his alternative equipment and method. <br />7.4 Observation and Testing <br />The jetting of the bedding around the conduits shall be observed by the <br />Geotechnical Consultant. <br />F-7
The URL can be used to link to this page
Your browser does not support the video tag.