Laserfiche WebLink
CUT-FILL TRANSnION LOT OVEREXCAVATION <br />REMOVE <br />UNSUITAELE -7 <br />GROUND IM <-- <br />/ <br />'OVEREXCAVATE <br />At«) RECOVECT <br /># TYPICAL <br />BENO{ING <br />UNWEATHERED BEDROOC OR MATERIAL APPROVED <br />BY THE GEOTEDI[ICAL CONSULTANT - <br />SIDE HILL FILL FOR CUT PAD NATEIRAL <br />GROUIO ---- <br />RESTRICTED USEAREA r .... / <br />/ <br />OVEREXCAVATE /O- FINISHED aIT PAD <br />AND REDOWIT <br />(REMACEMENT FILL),=--III-7--27 i<\NX\'0<\NOMA'J\Ir <br />OVERBURDEN <br />OR UNSUHABLE <br />MATERIAL <br />- - - -/1-2-->ej 1YPICA- BENCHII <br />' PAD OVERE)OCAVAT]ON AND REOOMPACTION <br />SHALL BE PERFORMED IF SPECIFIED <br />BY THE GEOTEGNICAL CONSULTANT <br />9' MIN. <br />- SEE STANDARD DETAIL FOR SUBDRAINS <br />WHEN REQUIRED BY ROTECHNICAL CONSUTANT <br />- UNWEATHERED BEDROCX OR MATERIAL APPROVED <br />BY THE GEOTEON[CAL CONSULTANT <br />TRANSmON LOT FILLS <br />AND SIDE HILL FILLS <br />GENERAL EARTHWORK AND GRADING <br />SPEaFICATIONS <br />STANDARD DETAILS E Leighton <br />P.f,Ing#70*#deabwe-odka,B 0/00)