Laserfiche WebLink
FAIRVIEW-STREET- ---11 Ill- PROJECT BOUNDARY r-8 1 1 <br />1 l <br />0 00 120 <br />SCALE FEEr <br />LEGEND <br />B-9 <br />T.O.r <br />PE»C Z <br />APPROXIMATE LOCATION OF <br />PERCOLATION TEST BORINGS <br />SHOWN WI™ TOTAL DEPTH (T.D.) <br />APPROXIMATE LOCATION OF HOLLOW <br />STEM AUGER BORING SHOWING TOTAL <br />DEPTH (T.D.) DEPTH TO PERCHED <br />GROUNDWATER IF APPLICABLE, AND <br />MEASURED DEPTH TO GROUNDWATER (G.W.) <br />UPON COMPLETION OF DRILLING. <br />CP;;-6 <br />T.D.75' <br />APPROXIMATE LOCATION OF CONE <br />PENETRATION TEST (C.P.T.) <br />SHOWN WI™ TOTAL DEPTH (T.D.) <br />B B' LOCATION OF GEOTECHNICAL CROSS <br />L - - - J SECTION <br />BORING AND CROSS SECTION <br />LOCATION MAP <br />THE ACADEMY <br />17TH STREET AND FAIRVIEW, SANTA ANA CALIFORNIA <br />FIGURE 2B <br />Proj: 603284-001 Eng/Geol: CK/JAR <br />Scale: 1"=60 Date: 11/11 <br />Leighton <br />1 <br />1 <br />r <br />7 <br />1ummummulmillumimmlilimmuumnma --1 <br />T.0.ILYUNTS)(CiASSROOMS) 2.,. . 1-= -1 <br />r <br />-01. 1 1,1 <br />0 <br />€ I <br />BLDG'D' 2 r i, <br />(FAMILY LWTS) <br />C <br />f 1_ECHANICAL L <br />L <br />BL <br />11(ADIUING <br />SlrPORD BLDG'H' <br />(CLASSROOMS --% * 14-1-BLDG 'G' a B-8 te -/Th <br />PHASE 2) <br />(GYMNASIUM - PHASE 2)MERC 1 <br />BLDG'F' <br />(FAMLY UNITS) <br />Two Slory <br />3 1 \ <br />11\I -Il Il Ill Ill <br />CT <br />tl <br />112 L - * <br />r