My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901-1919 N Fairview St - Soils Report
PBA
>
Building
>
Soils Reports
>
F
>
Fairview St
>
1901 N Fairview St
>
1901-1919 N Fairview St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:07:26 PM
Creation date
6/23/2022 1:32:37 PM
Metadata
Fields
Template:
Soils Report
Full Address
1901 N Fairview St
1902 N Fairview St
1903 N Fairview St
1904 N Fairview St
1905 N Fairview St
1906 N Fairview St
1907 N Fairview St
1908 N Fairview St
1909 N Fairview St
1910 N Fairview St
1911 N Fairview St
1912 N Fairview St
1913 N Fairview St
1914 N Fairview St
1915 N Fairview St
1916 N Fairview St
1917 N Fairview St
1918 N Fairview St
1919 N Fairview St
Street Number
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
Street Direction
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Street Name
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Fairview
Street Suffix
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
St
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
603284-001 <br />crushed rock was installed in the annulus from the bottom of the boring to the <br />adjacent ground surface; the crushed gravel was installed to prevent caving <br />of the loose, unconsolidated sands. <br />• A 55-gallon steel drum was fitted with a valve near the bottom of the drum <br />and a measuring device was installed inside the drum. Once filled with water, <br />the drum and measuring system was calibrated by measuring the amount of <br />time it took to fill a 5-gallon bucket from the valve. The decline of water in the <br />drum was measured in hundredths of inch increments during the tests and <br />the measurements were converted to gallons. <br />• Each in-situ field permeability test was performed by filling the test well and <br />maintaining a constant elevation in the well. The water level was maintained <br />at this level by allowing water from the 55-gallon steel drum to drain directly <br />into the well from the valve. Flow of the water into the well and the water <br />level was maintained using a gate valve. Flow/drum volume measurements <br />were taken at two to five minute intervals. The field data collected and the <br />calculated percolation rate for each well are presented in Appendix B. <br />Task 4 - Laboratory Testing <br />Geotechnical laboratory testing was performed on selected soil samples obtained <br />during our field exploration. The geotechnical laboratory testing program was <br />designed toward a quantitative and qualitative evaluation of the physical and <br />engineering characteristics of the onsite soils underlying the project site. The <br />program consisted of testing selected representative specimens, prepared from <br />representative samples, of the earth materials to obtain the following properties <br />and characteristics: <br />• Soil classification (ASTM D2488); <br />• In-situ moisture content and dry density (ASTM D2216, D2937); <br />• Compaction (ASTM D1557); <br />• Expansion Index (ASTM D4829); <br />• Atterberg Limits (ASTM D4318) <br />• Direct Shear (ASTM D3080); <br />• Consolidation (ASTM D2435); <br />-4- <br />Leighton
The URL can be used to link to this page
Your browser does not support the video tag.