My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60-62 W Civic Center Plaza - Soils Report
PBA
>
Building
>
Soils Reports
>
C
>
Civic Center Plz
>
60 W Civic Center Plz
>
60-62 W Civic Center Plaza - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 1:33:29 PM
Creation date
6/23/2022 1:33:18 PM
Metadata
Fields
Template:
Soils Report
Full Address
60 W Civic Center Dr
61 W Civic Center Dr
62 W Civic Center Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Job No: 01-3058-002101-00 <br />September 25, 1992 Log No: 2-2662 <br />Page 19 <br />o The values obtained per item b. above apply to both <br />square pad footings and shallow strip footings, <br />although they are slightly conservative for the <br />strip footing case. <br />o Provide minimum steel in continuous footings as <br />follows: <br />With Very High expansivity soil - 4x#5 bars, <br />2 on top and 2 at the bottom. <br />With High expansivity soil - 4x#4 bars, <br />2 on top and 2 at the bottom. <br />With less expansive soil - 2x#4 bars, <br />1 on top and 1 at the bottom. <br />o Bearing capacities should be re-evaluated when <br />loads have been obtained and footings sized. <br />o In the event that footings are founded in <br />' structural fill consisting of imported materials, <br />the allowable bearing capacities will depend on the <br />type of these materials,and should be re- <br />evaluated. <br />o A concrete moisture cutoff barrier, consisting of a <br />tie beam or thickened slab edge extending to a <br />corresponding minimum depth of 24 inches below the <br />lowest adjacent final grade, should be provided <br />between exterior individual footings. <br />o The heavier column footings should be connected by <br />grade beams. <br />o Planter areas should not be sited adjacent to <br />walls:otherwise, measures should be implemented <br />to contain irrigation water and prevent it from <br />seeping into walls and under foundations. <br />o Embedment depths should not be allowed to be <br />affected adversely,such as through erosion, <br />softening, digging, etc. <br />o Footing excavations should be observed by the <br />Geotechnical Engineer. <br />o Foundation plans and loads should be reviewed by <br />the Geotechnical Engineer. <br />...
The URL can be used to link to this page
Your browser does not support the video tag.