My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60-62 W Civic Center Plaza - Soils Report
PBA
>
Building
>
Soils Reports
>
C
>
Civic Center Plz
>
60 W Civic Center Plz
>
60-62 W Civic Center Plaza - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 1:33:29 PM
Creation date
6/23/2022 1:33:18 PM
Metadata
Fields
Template:
Soils Report
Full Address
60 W Civic Center Dr
61 W Civic Center Dr
62 W Civic Center Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
84 4City of Santa Ana b No: 01-3058-002601 <br />September 25, 1992 g No: 2-2662 <br />-00 <br />L Page 28 <br />8. LIMITATIONS OF INVESTIGATION <br />lit'... <br />44MZDE € <br />1 , T e .a. Our investigation was performed in accordance with the <br />12*''r.usual and current standards .of the profession, as they <br />relate to this and similar localities.No other <br />warranty, expressed or implied, is provided as' to the <br />conclusions and professi6nal advice presented in this <br />report. <br />b.The samples taken and tested, and the observations made, <br />are considered to be representative of the site; however, <br />soil and geologic conditions can vary significantly <br />between sample locations. <br />C.As in most projects,conditions revealed during <br />construction excavation may be at variance with <br />preliminary findings.If this occurs, the changed con- <br />ditions must be evaluated by the Project Soil Engineer <br />and the Geologist, and revised recommendations be pro- <br />vided as required. <br />d. This report is issued with the understanding that it is <br />the responsibility Of the Owner,or of his <br />Representative,to ensure that the information and <br />recommendations contained herein are brought to the <br />attention of the Architect and Engineer for the project <br />and incorporated into the plans, and that it is ensured <br />that the Contractor and Subcontractors implement such <br />recommendations in the field. <br />e. This firm does not practice or consult in the field of <br />safety engineering.We do not direct the Contractor's--I. .--- <br />-.- <br />292·,, <br />.t. , <br />...In
The URL can be used to link to this page
Your browser does not support the video tag.