Laserfiche WebLink
City of Santa Ana Job No: 01-3058-002201-00 <br />September 25, 1992 Log No: 2-2662 <br />Page 9 <br />7.CONCLUSIONS AND RECOMMENDATIONS <br />7.1 General <br />a.Based on the results of our review, it is our <br />opinion that the proposed development is feasible <br />from a geotechnical engineering standpoint, <br />provided that the recommendations of this report <br />are implemented during design,grading and <br />construction. <br />b.We are of the opinion that the proposed structures <br />can be supported on shallow pad and continuous <br />footings founded in compacted fill. <br />C.We consider that the anticipated grading will not <br />adversely affect, nor be adversely affected by, <br />adjoining property, with due precautions being <br />taken. <br />d. The design recommendations in this report should be <br />reviewed during the grading phase when soil <br />conditions in the excavations become exposed. <br />F /NAL Fee puu,J-}De-r,g,a FL·04 9 , F 1-'66 06-34A l.,6/)r <br />1 e.The foundation plans/design loads,should be <br />, reviewed by the Soil Engineer. <br />f. General geotechnical considerations applicable to <br />site grading and recommendations for the design and <br />construction of the project are discussed below. <br />6.- <br />.I: <br />4 ...1