My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
60-62 W Civic Center Plaza - Soils Report
PBA
>
Building
>
Soils Reports
>
C
>
Civic Center Plz
>
60 W Civic Center Plz
>
60-62 W Civic Center Plaza - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 1:33:29 PM
Creation date
6/23/2022 1:33:18 PM
Metadata
Fields
Template:
Soils Report
Full Address
60 W Civic Center Dr
61 W Civic Center Dr
62 W Civic Center Dr
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I r **kli.Iif/41.·: · 4/ahCity of Santa Ana Job No: 01-3058-002-01-00 9. ·"4 <br />September 25, 1992 Log No: 2-2662 .... <br />Page 28 <br />8. LIMITATIONS OF INVESTIGATION <br />a.Our investigation was performed in accordance with the <br />..usual and current standards of the profession, as<ItheySY <br />relate to this and similar localities.No : other , <br />warranty, expressed or implied, is provided as to the k <br />conclusions and professional advice presented in.-this <br />report. <br />b. The samples taken and tested, and the observations made, <br />are considered to be representative of the site; however, <br />soil and geologic conditions can vary significantly <br />, between sample locations. <br />e4 <br />C.As in most projects,conditions revealed during <br />construction excavation may be at variance with <br />preliminary findings.If this occurs, the changed con- <br />ditions must be evaluated by the Project Soil Engineer <br />and the Geologist, and revised recommendations be pro- <br />vided as required. <br />d. This report is issued with the understanding that it is <br />the responsibility of the owner,or of his <br />Representative,to ensure that the information and <br />recommendations contained herein are brought to the <br />attention of the Architect and Engineer for the project <br />and incorporated into the plans, and that it is ensured <br />that the Contractor and Subcontractors implement such <br />recommendations in the field. <br />e.This firm does not practice or consult in the field of <br />safety engineering.We do not direct the Contractor's <br />-' <br />-I. - -8 <br />.- <br />-i.*-I-* ill----1
The URL can be used to link to this page
Your browser does not support the video tag.