<br />--- INSPECTION
<br />I I RESOURCES
<br />-xpert, in Non,lestructive resting
<br />GPR / Cover Meter Results
<br />Project: 888 N. Main St. Santa Ana, CA
<br />6/29/2018 - 07/03/2018
<br />Area Line Inches Between Vertical Bars
<br />Vienanine Column 4 Chip location/Mesh Pattern Area
<br />Column 5 Vertical - Start edge, 3,5,3,4,5,3, end
<br />Horizontal - Start bottom bar, 8,5,5,5,5,4,6, end
<br />Column 6 Vertical - Start edge, 3,5,5,5,5,3, end
<br />Horizontal - Start bottom bar, 8,5,3,4,6,3,7, end
<br />Column 7 Chip location/Mesh Pattern Area
<br />Column 9 Vertical - Start Edge 2,7,5,7,3, end
<br />Horizontal - Start bottom bar, 9,4,5,5,4,4,8, end
<br />:loor 3 West Low Beam @ Col 11 Vertical - Start inside window, 8,24,9, end
<br />Horizontal - Start Floor, 18, 11, 6, end @ window
<br />West Low Beam @ Col 7 Vertical - Start inside window, 11, 21, 10, end
<br />Horizontal - Start floor, 17, 14, 8, end @ window
<br />North Low Beam @ Col 3 Vertical - Start inside window, 10, 24, 8, end
<br />Horizontal - Start Floor, 6, 14, 12, 5, end
<br />West Col 11 Vertical - Start left window edge, 2 10, 8, 3, end
<br />Horizontal - Start floor, 4, 8, 4, 3, 4, 7, 15, 18, 18, end
<br />North Col 3 Vertical - Start left window edge, 2,4,9,7,3, end
<br />Horizontal - Start floor, 8, 6, 5, 5, 9, 8, 18, 17, end
<br />North High Beam @ Col 1 Vertical - Start wall, 18, 8, 14, 18, 18, end
<br />Vertical - Start wall, 18, 8, 7, 7, 13, 5, 11, 7, end
<br />Horizontal - Start roof, 9,6,6,6, end
<br />North High Beam @ Col 3 Vertical - Start framing, 10, 21, 17, end
<br />Vertical - Start framing, 5, 5, 11, 10, 10, 7, end
<br />Single horizontal bar middle of beam
<br />;PR DETECTED 3 TARGETS IN BOTrOM OF BEAMS
<br />;PR DETECTED 2 TARGETS IN BOTTOM OF GIRDERS
<br />;irders = 20" thickness
<br />12" thicknessteams =
|