Laserfiche WebLink
*,'SNTA <br />NA-tffi <br />Planning & Building Agency <br />Buildlng Salsty Division <br />20 Clvic Centsr Plaza <br />P.O. Box '1988 (M-19) <br />Santa Ana, CA 92702 <br />(71lt) 647-s800 <br />www.santa.ana.o.g <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />GHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESTDENCES Onty <br />lnslructions: The licensed clntractor of record shall complete all sections, answer the len questions and <br />sign the certification seclion below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11'' x'17" size. lf answerino NOto anv of lhe oueslion s. Dlan check shall be reouirad <br />Prolect Address:1910 S. WOOD ST, SANTA ANA, CA 92704 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contraclorLicenseNumber: 1004667 <br />YES <br />1E <br />28 <br />3. El <br />4. El <br />5. El <br />6.8 <br />7.8 <br />s. El <br />e.E <br />10. E <br />NO <br />tr <br />tr <br />o <br />tr <br />tr <br />tr <br />tr <br />tr <br />D <br />D <br />Are the following appllcable to the proposed project? <br />Will lhe PV system layoul provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shor/n on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer wilh no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installsd where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system b€ installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface ol the roof? <br />Will the PV system be installed without using any ballast system or counler-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-'l12 inch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL lha structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including proiect specilic site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />I cedtfy under penalty of periury undor the laws of th <br />print Name: TRANG CONG PHAM <br />phone Numbar: 714 582 3909 <br />e State of <br />Signature <br />Date: <br />c"rr.-2tqad-"t*" <br />Email Address <br />Rev: 81 1712015 <br />PERMIT@SOUTHWESTSUNSOLAR.COM <br />+7e\/s <br />is true: