Laserfiche WebLink
Permit #: {O{98357 <br />Pin #: 6{236 <br />q <br />Project Address: 2424 N Tustin Ave <br />Assessor's Parcel 396-251-55 Lot: I <br />Unit Bldgi Address Range: <br />24-F <br />Tract: A.B. CHAPMAN <br />Suite Range: Units F-2 <br />Zoning: R4Block: A Historic: No <br />Building Use: <br />Job Type: <br />Nature of Work: <br />Exasting Bldg. & Use <br />Proposed Use: <br />Planning Conditions: <br />Multi-Family (5 or more units) <br />Alteration <br />W/D Partition (unit 2) <br />8-UNIT APT W/OET CARPORTS <br />Occupancy: <br />Constr Type <br />Codel <br />Flood Zone: <br /># of Stories: <br />R-2 <br />VB <br />cBc 2016 <br />x-0602320164J <br />2 <br />1st FL Area: Patio: <br />2nd FL Area: T.l.Area: <br />Other Areas: Yards Req'd: <br />Garage Area Valuation: <br />Rr,l r,'-:ro:.'i ..1/ 11/ 2ti|gTotal: 111 ,re0,-, .,rnsi: lB <br />Description of Work: Expand coat closet opening for W/D in units with 2 bathrooms No bedroom addition, {,}tprior afteration anqoIii]rfr;tio{l1L "qrrr"footage proposed at this time. Original P/C performed under #10193842.Ironsoct ion Total <br />fu"ifls 6eneril Construct ion <br />t2r 191.31 <br />lnc <br />Phone: <br />Tenant: <br />Engineer <br />Address. <br />nr. r .' r 'i' ilr rtt.p F,rl, <br />ItliL , . r, rtl <br />Lil ,: <br />Lti'rl <br />ll.l,:: .,:l' -ri',t rns <br />Michael PiBdandwdv &' AsSocii*.i3 <br />Michael P Boardway <br />P O Box 154 <br />Blue Jay, CA 923'17 <br />(949) 208-2979 <br />Phone: <br />License # <br />Architect / <br />Desiqner: <br />Address: <br />Phone: <br />License # <br />ll, <br />Auth+ ! l:l:iii4 <br />Chavez, Dave <br />Date: <br />Date: <br />Dale 1111412018 <br />Subject to Field: <br />$'r60.2s <br />$1 .00 <br />$22.08 <br />$55.04 <br />07776002 51601 Permit Fee <br />07776002 57672 Bld1. Stds. Revolving <br />07776002 57600 Genetal Plan Update <br />07775002 51601 lssuance <br />Fire lnsp. Req'd: <br />Police lnsp. Req'd <br />Flood Zone Cert. Req'd: No <br />Every peinit issued shall become invalid unless the wo* on the sito authorized by <br />such permit is commenced within 180 days after its issuance,or if the work aulhorized <br />on the site by such permit is suspended or abandoned fot a period of 180 days aftet <br />lhe lime the wo* is confienced. <br />No <br />No Account#Total <br />$22.08 <br />$215.29 <br />$1 .00 <br />$238.37 <br />$0.00 <br />$238.37 <br />lnspector MtD#. 2018-147651 <br />011 16002 51600 <br />011 16002 51601 <br />011 16002 51612 <br />Fee Totall <br />Paid to Date: <br />Balance Due: <br />city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building <br />Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853 <br />$7,000.00 <br />I <br />Owner: <br />Address: <br />The Bascom Group, lnc Contractor: Arias General Construction <br />26 Corporate Park Drive, Suite 200 Address: 17015 Casimir Ave <br />lrvine, CA 92606 Torrance, CA 90504 <br />(949) 955-0888 Phone: (310) 350-8198 <br />State Lic #: 1017936 <br />Lic Type: B <br />Bus. Lic #: 366738 <br />Workers' Compensation lnsurance: <br />Carrier: State Fund <br />Policy #: 9211358 <br />Expires: 0512612019 <br />Planning Approval By: <br />Plan Checked By: <br />Permit lssued By: <br />NPDES lnsp. Req'd: No <br />PWA lnsp. Req'd: No <br />Planning lnsp. Req'd: No <br />Landscaping lnsp. Req'd: No <br />[/]isc Receipt: <br />N,4isc. Receipt <br />l\,4isc. Receipt