Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA-92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RES!DENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENGES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. !f answerinq NO to anv of the questions. plan check shall be required. <br />Project Address: 933 West Brook Street, Santa Ana, California92703 <br />2 <br />3 <br />4 <br />5 <br />Contractor Company Name: Empire Solar Group <br />Contractor License Number: 1062912 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Willthe minimum 5/16" lag screws be installed with a minimum of 2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1.4 tr <br />8 Etr <br />Etr <br />trtr <br />EItr <br />Etr8tr <br />Etr <br />trtr <br />6 <br />7 <br />9 <br />10 trtr <br />I certify under penalty of perjury under the laws of the State of Galifornia that the above is true <br />print Name. Alex Egbert Signature alt <br />phone Number: 801 -829-7629 Date 6t1912020 <br />Email Address: capermits@empiresolargroup.com <br />Rev:8/29119