Laserfiche WebLink
,,-SANTA <br />ANA,"i'ffi! <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Genter Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />!nstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. !f a <br />Project Address <br />Contractor Company Name: <br />Contractor License Number: <br />qo b <br />tr <br />tr <br />,E <br />F <br />4 <br />5 <br />1.-El tr <br />2 8tr,Fe <br />6 tstr <br />7 Etr <br />B trtr <br />9 Ftr <br />,o7d <br />I certify under, <br />YES No Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the rninimum 5/16" lag screws be installed with a minimum ol 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Print Name <br />nalty of perjury under the laws of the State of Cal <br />Signature <br />Phone Number: <br />Dgtm4(b€^^,tAddress: <br />L <br />Rev: 1 1 /1 9/201 5 <br />Date. <br />that the above is <br />'l