Laserfiche WebLink
. EXPEDITED PERMIT PROCESS FOR SNAALL-SCALE PV SYSTENAS <br />MICRO-INVERTER <br />The informarion in rhis guideline is intended ro help local jurisdictions and contractors identify when PV system installations <br />are simple. needing only a basic review and when an insEllation is more complex. It is likely that 50%-75% of all residential <br />sysrems will comply wirh rhese simple crireria. For projects that fail to meet the simple criteria. resolution steps have been <br />suggested to provide as a path to permit approva!. <br />Requireil Information fot Perfiit: <br />1. Sire plan showing locarion of major componenrs on the property. This drawing need not be exactly to scale, but it <br />should represent relarive location of componenrs ar site (see supplied example site plan). PV arrays on dwellings <br />with a 3' perimeter space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration. wiring system, overcurrent protection. inverter, disconnecrs, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specifrcarion sheets and installation manuals (if available) for all manufactured components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1: Structural Review o[ PV Array Nulounting System <br />Is the array to be mounted on a defined, permitted roof structure?ves n No <br />U No due to non-compliant rooJ or a ground mount, submit completed worksheet Jor the structure wKSl <br />Roof Inforfiation: <br />COI,4P,SHINGLE1. ls rhe roofing type lightweight (Yes = composition, lightweighl masonry, metal, elc...) <br />lj No, submit completed worksheet jor rooJ structure WfiSl (No = hel.vy masonry, slate, etc...) <br />ves Er,lo <br />IJ No, submit completed worksheetJor rooJ structurc WNSI <br />2. Does the roof have a single rooF covering? <br />FLASHING Y CAULK <br />ineered product designed to mounr PV modules with no rnore than an 18" gap <br />OUICK I\4OUNT <br />3. Provide method and type of weatherproohng roof penetrations (e.g. flashing, caulk) <br />M ounting 3y s t ern InJormdtion : <br />l. ls rhe rnouniing structure an <br />beneath the module frames? <br />en <br />Yes ! t',to <br />U No, provid.e details oJ sttuctural attachment certtfed by a design professional. <br />2. For manufactured mounting systems, fill out information on the mounting system below <br />roduct Name and Mode 1g CLASSIC COMPOSITION MOUNIa. N4ounting System Manufacturer <br />b. Toral Weighr <br />c Total Number of Attachment Poinrs 26 <br />f. Total Surlace Area of PV Modules (square feet) <br />g. Distributed Weight of PV N4odule on Roof (b : D <br />of pV N4odules nn6 no11r 1,159.6 lbs <br />d. Weighr per Attachment Point (b + c) 44 6 lbs (if greater than 45 lbs. see wKSl ) <br />e. Maximum Spacing Between Attachment Points on a Rait 72 inches (see producl manual for <br />maximum spacing allowed based on maximum design wind speed) <br />677 fi'? <br />1 .71 <br />IJ distributed weight of the Pv system is greater than 5 lbstt'1, see wRSl . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a Pv system to be considered for an expedited permit process, the foltowing must apply: <br />t. PV modules, utility-inreractive invefters. and combiner boxes are identihed for use in PV systems. <br />2. The PV array is composed o[ 4 series slrings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13.440 watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(8)). <br />5. One ol the srandard electrical diagrams (81.1. E l.la, E l.lb, or El.lc) can be used to accurately represenr the PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram comptetely. A guide to the electrical diagram is ptovided to help the applicant <br />underctand each blank to frll in. IJ the electrical system is more complex than tlrc standard electrical diagram can ejfectively <br />communicate, provide an alternative diagram with appropriate detail. <br />2 EXPI]DITIJD PERMIT PROCESS FOR PV SYSTEMS - MICRO-INVERTER <br />lbs/fu1