Laserfiche WebLink
*,,SANTA <br />NA <br />PLT\$C <br />& BIIIDI\C <br />$rw <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />santa Ana, cA 92702 <br />(714) 647-5800 <br />www.santa-ana.org soL{l cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section**lf answering NO to any of the questions, plan check shall be required.** <br />Project Address:2308 NORTH OAKMONT SANTA ANA, CA92706 <br />Contractor Gompany Name:Ct,EAN INITIATIVE LLC <br />Contractor License Number:# 1038376, B <br />trtr <br />trtr <br />YES NOtrtr <br />2 <br />4 <br />5 <br />Etrtrtr <br />trtr <br />Eltr <br />8 Etr <br />9. Etr <br />10.EE <br />6 <br />7 <br />I certify under penalty of per,iury under the laws of the State of <br />Print name: l@ flcr/ tLa<- L^ S11 Signature <br />Date: <br />California that the above is true <br />12020Phone Number <br />Email Address: .,, <br />Reu 2h712015 <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and lhe surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 <br />5-