My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170569 - Permit (3)
PBA
>
Building
>
Permits
>
O
>
Oakmont Ave
>
2308 N Oakmont Ave
>
20170569 - Permit (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 2:11:07 PM
Creation date
11/14/2022 2:11:05 PM
Metadata
Fields
Template:
Permit
Permit Number
20170569
Full Address
2308 N Oakmont Ave
Permit ID
262193
Master ID Number
2020-157019
Project Name
Miscellaneous Counter1 Permit
Street Number
002308
Street Direction
N
Street Name
Oakmont
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/13/2020
Issued Date
1/13/2020
Finalized Date
2/14/2020
Flood Zone
X-0602320163J
Description of Work
Install roof mounted solar panels. FEES PD ON 101102810
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IIT } EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTENAS <br />. STANDARD STRING SYSTEN^ <br />The informarion in this guideline is inrended ro help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an insrallation is more complex. It is likely rhat 50 % -7 5% of all residential <br />sysrems will comply with these simple criteria. For projects that fail to meet the simple criteria. resolution steps have been <br />suggested to provide as a path to permit approval. <br />Reqaired InJormation for Pefinit: <br />1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relarive location of componenis aL site (see supplied example site plan). PV arrays on dwellings <br />with a 5'perimeter space ar ridge and sides may not need separate fire service review. <br />2. Elecrrical diagram showing PV array conhguration, wiring sysrem, overcurrenr prorecrion. inverter, disconnecrs, <br />required signs. and ac connection to building (see supplied standard electrical diagram). <br />3. Specification sheers and installation manuals (if available) for all manulactured components including. but not <br />limited to, PV modules, inverrer(s), combiner box. disconnects, and mounting system. <br />Step 1: Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure?ves E no <br />U No due to non-compliant rooJ or a ground mount, submit completed worksheet lor the structure wKSl <br />Roof InJonnation: <br />CON,IP SHINGLEl Is the roofing rype lightweight (Yes = composition, lighrweight masonry, metal, etc...) <br />U No, submit compteted worksheet lor roof sffucture WKSI (No = heavy masonry, sldte, etc.. .) <br />2. Does rhe roof have a single roof coveringi Eves Er'lo <br />IJ No, submit completed worksheetJor rooJ structure WRSI. <br />f. Provide merhod and type of wearherproofing roof penerrations (e.g. flashing. caulk)FLASHING Y CAULK <br />ineered product designed to mount PV modules rvith no more than an I8' gap <br />Yes ! No <br />M ounting 3y s t em Information : <br />l. Is the mounting srructure an en <br />Y No, provide details oJ structural attachment cerdrted by a d6tgn professional. <br />2. For manufactured mounting systems, hll out information on rhe mounting system below <br />beneath the module frames? <br />b. Total Weighr of PV Modules 2n6 q2115 1,425 6 165 <br />C Tot al Number of ALrachment Points 48 <br />a. Mounlng Svsrem N4anufacrurer oulcK MOUNT Product Name and Mode 19 CLASSIC COI\.4POSlTlON MOUNT <br />d. Weighr per Attachment Point (b + c)29.7 bs (if greater than 45 lbs. see WKSI ) <br />e Maximum Spacing Between Aftachment Points on a Rail 48 inches (see product manual lor <br />maximum spacing allowed based on maximum design wind speed) <br />r.Total Surface Area of PV Modules (square feet)1,438 <br />0.99 <br />irr <br />Disrributed Weight ol PV Module on Roof (b : 0 lbs/frl <br />IJ distributed aeight oJ the Pv system is greater than 5 lbstt', see WRSI . <br />Step 9: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system to be considered for an expedited permit process, the following must apply: <br />l PV modules, utiliry-inreractive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed oF 4 series strings or less per inverter. <br />3. The rotal inverter capacity has a continuous ac power output 13.440 Watrs or less <br />4. The ac interconnection point is on rhe load side of service disconnecting means (690.64(B)). <br />5. One of the srandard electrical diagrams (E1.1, El.la, E l.lb, or El.lc) can be used to accurately represenr the PV <br />system. lnteracrive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagrum completely. A guide to the electrical diagram is provided to help the appltcant <br />understand each blank to rtll in. IJ the electrical system is more complex than the standard electr'lcal dtagram can elrectively <br />communicate, provide an alternative diagram Nith approprlate detail. <br />2 Exp[DrrED PERMTT PRocESs FoR PV Sysrr,Ms
The URL can be used to link to this page
Your browser does not support the video tag.