Laserfiche WebLink
Plannlng & Bulldlng Agency <br />Bullding Safoty Dlvision <br />20 Clvic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.aanta-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{l cBc 2013 <br />Solar Photovoltalc (PV) Checkllst for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached lo each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerin NO to any of the questions . olan check shall be required. <br />Project Address:1006 E Buffalo Ave, Santa Ana, CA 92706 <br />Contractor Company n"r". Solar City <br />888104Contractor Llcense Number: <br />YES NO <br />EI tr <br />I Eltr <br />trtr <br />@o <br />trtr <br />@o <br />@D <br />trtr <br />2 <br />J <br />6 <br />7 <br />4 <br />5 <br />Are the following applicabl€ to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV systom be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast syst€m or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2'112 inch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including prolect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />s Eltr <br />10.trD <br />I cortlty under penalty of periury undor the laws of tho State of Callfornle that the above ls true: <br />print Name: Mike Baba sisnature: <br />- <br />trlr/.,/ 4/i*- <br />Phone Number:6694442515 <br />Email Addre <br />Rov: 8/17120'15 <br />ss. MBABA@SOLARCtTY COM <br />Dar, 1/5/2017 <br />lLl\\l\[ <br />ll;nil