Laserfiche WebLink
,-,,SANTA <br />NA,ti}$ <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.s a nta -a n a. o rg <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBC 2013 <br />Solar Photovollaic (PV) Checklist for Detached STNGLE FAMtLy RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certitication section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17' size. lf answerinq NO to anv of the questions. plan check shall be required, <br />Proiect Address:O <br />Contractor Company Name: <br />Contractor License Number: <br />_<=-r /12t9/- <br />1 <br />,r/noSo Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 'lO" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-l12inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages ofthe plans stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2 <br />3 <br />4 <br />5 <br />tr <br />tr <br />tr <br />gta6 <br />7 <br />8 <br />9 <br />tr <br />10 D <br />I certify u nder p <br />Print Nam <br />Phone Number <br />Email Address: <br />the State of California that t <br />Signature <br />Date: <br />Rev 11/19/2015 <br />of ury U er laws is true: