Laserfiche WebLink
-,-SANTA <br />ANA/I <br />i\IIIG <br />flNNC <br />ICI\TI <br />Planning & Building Agency <br />Building Sarety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 52702 <br />(714) 647.5E00 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltalc (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of thrs form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the ques tions. olan check shall be reouired. <br />Project Address:514 S Rosewood Ave, Santa Ana, CA 92703 <br />qtr <br />trtr <br />EOatr <br />trtr <br />tro <br />2 <br />4 <br />5 <br />Contractor Company Name . Solar City <br />contractor Ltcense Number' 888104 <br />YES NO Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of lhe California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a rool having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled onds, ridges and hips)? <br />Will th€ PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum honzontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch <br />embedment into roof rafters (with predrilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET slamped and signed by a Califomia <br />licensed professional engineer? (including projecl specific site plan, PV layout, <br />anchorage spacing, anchorage d€tails and manutacturer's PV support information.) <br />E tr <br />trtr <br />trtr <br />6 <br />7 <br />8 <br />9 <br />10.trtr <br />I certlfy under penalty of perjury under tho laws of the State of C rnia that tho above ls true: <br />phone Number: 7 20.292.'l 594 <br />Emait Address: Rhauger@SOLARCITY.COM <br />7 <br />Rev: 8/1712015 <br />Date. 3 /3 I /20 <br />print Name: Roger Hauger Signature: