My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10193158 - Permit (2)
PBA
>
Building
>
Permits
>
S
>
Spruce St
>
2234 N Spruce St
>
10193158 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 2:42:57 PM
Creation date
11/16/2022 2:42:56 PM
Metadata
Fields
Template:
Permit
Permit Number
10193158
Full Address
2234 N Spruce St
Permit ID
230829
Master ID Number
2017-136565
Project Name
Miscellaneous Counter1 Permit
Street Number
002234
Street Direction
N
Street Name
Spruce
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
6/5/2017
Issued Date
6/5/2017
Finalized Date
6/21/2017
Flood Zone
X-0602320144J
Description of Work
Install roof mounted pv panels. Per Residential Photovoltaic Checklist.
Nature of Work
Solar Panels
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www,santa-ana.org <br />EIIEEEEEIG! j.l5!!lf!ljllfE=, -arM]-i: li !l-!l:-li ie5lt-t*[E:rl,H[trJlItlEllEgftEEEtrlsol{1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1'1" x 17, size. lf answerinq NO to any of the questions, plan check shall be required. <br />Project Address:LL1'1 <br />RES!DENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />t Q2 <br />Contractor Company Name: <br />Contractor License Number: <br />4 <br />5 <br />2 <br />3 <br />YES NO <br />Etr <br />6n <br />qtr <br />9trqtr <br />(o <br />Are the following applicable to the proposed project? <br />Will the PV syslem layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the struclural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />qtr <br />trtr <br />do <br />tr tr <br />I certify under peialty of perjury pnder the <br />Print Name: /]n,'a.rt ,/41r, ", ,, <br />laws of the State of California that the above is true: <br />Phone Number <br />Email Address: <br />,,-SANTA <br />NA <br />ILT\\NC <br />{BUIDNC <br />rc[\(1 <br />Rev: 1'tl19/2015 <br />-W -) <br />/" <br />ZY\o <br />/a vo t4 <br />S ig nature: <br />6. <br />7. <br />8. <br />9. <br />10. <br />Date: 6'<-- I )'l-
The URL can be used to link to this page
Your browser does not support the video tag.