Laserfiche WebLink
Plannlng & Building Agency <br />Buildlng Safety Oivision <br />20 Clvlc Center Plaza <br />P.O. Box 1988 (M-r9) <br />Santa Ana, CA 92702 <br />(71lt) 6/17-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall flll in the address of the proiect, contractois <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the questions, plan check shall be required.* <br />Proj ect Address: 1033 NORTH CUSTER STREET SANTA ANA, CA 92701 <br />Contractor Company Name: <br />Contractor License Number: <br />SUNLUX ENERGY, INC <br />1 trtr <br />trtruu <br />otr <br />trtr <br />YES NO <br />x <br /># I 00tt37.1 (C- I 0) <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10' maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Firc Safety Elements of Solar Photovoltaic Syslems" <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including prqect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />tr <br />trtr <br />I trtre trtr <br />10. EE <br />I certify under p_qnalty of perjury under the laws of th,/./ <br />Print name: (a?';", e-';'z , t '-/-D/a4-aZ<, <br />PhoneNumber: t7"Y )7a 1 Zj? <br />e State of California that the above is true: <br />Srgnature <br />Date <br />Email Address .olr -C ^J Q 5,n /t, <br />,,-SANTA <br />NA <br />llt\]l\G <br />&B[tDt\c <br />lctvt <br />Rev:211712015 <br />- 24e,.