Laserfiche WebLink
*,SNTA <br />NA <br />Itr\l1\c <br />&ilmlc <br />lGt\$ <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box l988 (M-'19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.or9 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17'size. lf answerino NO to anv of the q uestions. Dlan check shall be required. <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO <br />E tr <br />ds <br />du <br />du <br />du <br />c10.tr <br />Print Name <br />Phone Number <br />|? <br />l\'? A i-7 \r v,e v "u i.-i r r i'i c ". \ <br />1 <br />__1)J1-\----.|=_- <br />r -,-r- \r\\\L ?9 .i,- . .. t?rrlYr \! T-7cE \ rr:,-tJ -7 <br />2 <br />3 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to '10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" Iag screws be installed with a minimum of ?-112 inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of periury under the laws of the State of <br />ds <br />da <br />dudn4 <br />5 <br />6 <br />7 <br />I <br />9 <br />""-p)il"::'i:"u*'Signature <br />Date: <br />Rev 11/19/2015 <br />t:C <br />sol{r cBc 2013 <br />i\Email Address: