Laserfiche WebLink
,-,'SANTA <br />NAqil* <br />Planning & Building Agency <br />Building Safety Oivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Project Address:3Z I E. y'-o ro, ^.,-A 4ue =a <br />yrt- ANA <br />Gontractor Company Name: <br />Contractor License Number: <br />YES NO <br />1 51tr <br />,-8tr <br />3>EIE <br />Z=z-,- EtlEetz4,*rr. L7- <br />4 <br />5 <br />7 <br />9 <br />tr <br />tr <br />F <br />A} <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 'l of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof raflers (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufa <br />6 JEI tr <br />Eltr <br />88tr <br />.Eltr <br />10 )El E <br />P p nformation.) <br />ueI certify under penalty of per.iury under the laws of the State rnt <br />print Name: '7r-u- /t:--,->gc, rJ Signature <br />-- <br />Email Address: ?E e.^...2-2,-7-2/v c=2 Q 8te€*€z-4/ a-o - c--/-../'<< <br />veist <br />a7 <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size <br />phone Number: C;z u> 20/-31?l> Date: <br />Rev: 11/19/2015