Laserfiche WebLink
SA}iTA <br />I\A <br />lqginc-er,,,ft&,6 1,. I \,Bullding S.fdy alltion <br />20 Clvlc Ccnbr Plrzr <br />P.o. Bor ltoE (r-19) JU,AJ (J R . nttSrnts Ans, CA giu02 " t.tt i I <br />(71'l) 647-5t00 <br />w*wteda{na-org t-ltV of 5^,111,, _r.,, <br />E IhYl ESIDENTIAL <br />OTOVOLTAIC <br />CHECKLIST <br />sol-01 csc 2013 <br />Solar Photovoltalc (PV) Checklist for Dotachod SINGLE FAUILY RESIDENCES Only <br />lnStructbr6: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of thas form shall be attached to each of TWO sets of plans, of <br />minimum I l' x 17' size. I answerlno NO to any of tho qusltions. olan check .h.ll bo rooulrod, <br />P rorect Addre33: 2028 E WELLINGTON <br />Contractor Company tr166. ADVANCED TMPROVEN'rrENTS tNC <br />contractor Licenee Number: 947761 <br />1 <br />YES ilotrtr <br />Etr <br />tr <br />tr <br />otr <br />Ar€ the following applic.blo to the propo!.d projecl? <br />Vltrll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605 11 of the Calibmia Fire Code, and is this sho\.m on fre roof plan? <br />Wll fie PV system be installed on a roof having only one roofing layer with no <br />ovedays? <br />Wll the PV anay be ffush mounted to the existing roo, so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV systsm weigh maximum 4 pounds per square fs€t or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2' minimum to 10' maximum b€tw€€n <br />the underside of modules and the surface of the rmf? <br />\Mll the PV system be installed without using any ballast system or counter-weight <br />System? <br />\MIlthe anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16'lag screws be installed with a minimum of 2-1l2 inch <br />embedrnent into ropf rafters (with pre<rilled holes) and is this minimum emHment <br />sho rn on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed probssional engineer? (including proiect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manuf,acture/s PV support information. ) <br />2 <br />3 <br />4 <br />6. aE <br />7 atr <br />8 Elo <br />9 EID <br />10 EIE <br />I certify under penahy of perjury under the laws of the Stat6 of Califomia that the abovo is true: <br />pnnt Narne: JASON HAYES Signature: _ <br />phone Number: 714-630-661 1 <br />Emait Address: JASON@ADVANCEDIMP.COM <br />Rev: 11/19/2015 <br />pslg 5/8/'17