My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10193262 - Permit (2)
PBA
>
Building
>
Permits
>
R
>
Rosewood Ave
>
2203 N Rosewood Ave
>
10193262 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 1:50:24 PM
Creation date
11/17/2022 1:50:22 PM
Metadata
Fields
Template:
Permit
Permit Number
10193262
Full Address
2203 N Rosewood Ave
Permit ID
231272
Master ID Number
2017-136810
Project Name
Miscellaneous Counter1 Permit
Street Number
002203
Street Direction
N
Street Name
Rosewood
Street Suffix
Ave
Building Use Code
Resid-2 units
Job Types
Solar
Permit Type
Building
Applied Date
6/14/2017
Issued Date
6/14/2017
Finalized Date
10/16/2017
Flood Zone
X-0602320144J
Description of Work
Installation of roof mounted PV system. Worksheet attached to plans.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;#NIA <br />NA.'ffi <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol,o1 c8c 2013 <br />Solar Photovoltaic (PV) Checktist for Detached STNGLE FAMILy RESIDENCES Only <br />lnstructions: The <br />sign the certificatio <br />minimum 1 '1" x 'l 7" <br />Proiect Address: <br />Contractor Company Name: <br />Contractor License Number <br />licensed contractor of record shall complete all sections, answer the ten questions and <br />n sec <br />size. <br />tion below. A copy of thts form shall be attached to each of TWO sets of plans. of <br />uired.lf answerin NO to an of the uestions lan check shall be re <br />Zzas u( <br />.4()c <br />2 <br />3 <br />YES,NOila <br />da <br />(a <br />Eo <br />EN <br />Eo <br />Eo <br />Es <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existjng roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxjmum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to i0,,maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be lnstalled without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the manimum 5/16" lag screws be installed with a minlmum ot 2-1lZ inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />er p ury under the laws of the State of Califor <br />fe a*Signature <br />Date <br />4 <br />5 <br />6 <br />7 <br />tr <br />tr <br />M <br />tr <br />8 <br />I <br />10 <br />I certify und <br />Print Name: <br />c.hz>-, <br />(Cct <br />Rev 11/19/2015 <br />ena Ity of pe <br />d 35 3alqC. <br />at the ab <br />Plan ning E Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 {tul.1 9 ) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.sa nta-a na.org <br />Phone Number: <br />Emarl Address <br />,.-
The URL can be used to link to this page
Your browser does not support the video tag.