Laserfiche WebLink
*;,SNTA <br />NAJffiH <br />Planning & Bulding AgencY <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sot-01 c8c 2013 <br />sotar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the proiect, contractor's <br />licensing information and answer questions 1 -10 below. complete and sign the certiflcation section <br />'tlf answering NO to any of the questions, plan check shall be required'** <br />Pro.iect Address 29I6 FERNWOOD DRIVE SANTA ANA cA 92706 <br />Conlractor CompanY Name <br />Contractor License Number:#1025115 (C-46) <br />YES NO Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />will the PV system be installed where lhe modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />WilI the PV system be installed with a space of 2', minimum to 10', maximum between <br />the underside of modules and the surface of the roof? <br />tv^/ill the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire safety Elements of solar Photovoltaic syslems" <br />by OCFA? (Guideline available on the OCFA website: htto://www ocfa oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol 2-112inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific srte plan' PV layout' <br />anchorage spacing, anchorage details and manufacturer's PV support lnformation ) <br />Etr <br />trtr <br />Lltr <br />: PG q SOT,A R <br />2 <br />3 <br />tr <br />D <br />E <br />tr <br />4 <br />5 <br />6 <br />7 <br />tr <br />tr <br />tr <br />8 \ <br />I <br />10 <br />lcertify under Penalty of P erjury u nder the laws of the State of California tha e above i rue <br />Print name <L w1 U-.9 Signature <br />Phone Number' -1 <br />Email Address <br />x <br />I <br />\ <br />-\ <br />\ <br />Re'l: 21 17 12015 <br /><2_Ldt,( <br />1.Date