Laserfiche WebLink
*,,SANTA <br />NA,',ril)ffi <br />Planning & Building Agency <br />Building Safety 0ivision <br />20 Civic Center Plaza <br />P.O. Box 1986 (M-'19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 c8c 2013 <br />Solar Photovoltaic (PV) Checklist for Delached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />manimum 11" x 17" size. lf answerin NO to an of the uestion an ch ck ha be u ired. <br />Pro,ect Address Qa ) <br />Contractor Company Name: <br />Contractor License Number: <br />1 <br />2 <br />3 <br />4 <br />YES NO <br />Etr <br />Etr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooting layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />-Will{he PVsystem be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />under the laws of the State of California that th <br />tstr <br />EN <br />6 6tr <br />7 Etr <br />8 Etr <br />e 9tr <br />10.ED <br />I certify under <br />Print Name: <br />Phone Number <br />Email Address: <br />Signature <br />Date: <br />Rev: 11/19/2015 <br />Ity of perl a is true: <br />I