Laserfiche WebLink
SAN <br />ANA <br />IA <br />llr\\lG <br />;[Ul.D[[ <br />IGtIO <br />0[ 01 <br />Planning & auitalng elency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />wwrv,santa-ana.org <br />sol{l cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17'' size. lf answerinq NO to anv of the ouestion s, plan check shall be reouired. <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Proiect Address:qbos <br />Contractor Company Name: <br />Contractor License Numb6r: <br />i Aru. <br />o\t Y(t {ve e.(L <br />113'tsa <br />YES NO, E-tr <br />, Ftr <br />s Etr <br />q <br />s tr <br />tr <br />trD <br />trtr <br />Ea <br />Btr <br />10 tr <br />4 <br />6 <br />7 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to '10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be inslalled without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury under the laws of th <br />8 <br />I <br />Print Name Alo e*^; fon, <br />Phone Number: i!l.' 1Ll2 lZ1 o <br />e State of California that the above is true: <br />Slgnature: <br />Date: i/.' t <br />Email Address: /, Ct,. t, <br />Rev: 11/19/2015 <br />2artL \./rvr^t Sola-r. (ow-l <br />I