Laserfiche WebLink
*-SANTA <br />NA <br />IL{\IN <br />&[[lrINC <br />$Nt <br />Plannlng & Bullding Agency <br />Bulldlng Srfety Divlslon <br />20 Clvlc Center Plaza <br />P.O. Bor 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-€na,org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />I <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Onty <br />Instructions: The licensed contractor of rscord shall complete all sections, answer the ten questions and <br />sign the certification sect <br />minimum 11" x 17" size. <br />ion below. A copy of this form shall be attached to each of TWO sets of plans, of <br />answen of the eck shall be llr <br />3621 S. OLIVE ST, SANTAANA,CA92707 <br />Gontractor Company Name:SOUTHWEST SUN SOLAR, INC <br />conlraclorLicense Number:'1004667 <br />YES NO Are lhe followlng appllcable to tho proposed proJect? <br />Will the PV system layout provide the rsquired three-foot wid6 clsar accoss palhways <br />per Section 605.1 1 of the Califomia Fire Code, and is lhis shown on the roof plan? <br />Will the PV syslem be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mountsd to the existing roof so that the plane ot the <br />modules (panels) are parallel to the plane of the roon <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modul€s do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installsd with a spacs of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizonlal spacing shown on the plans? <br />Will the minimum 5/16" lag screws b6 instalted with a minimum ot 2-.1/2 inch <br />embedmenl into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL th6 structural pagos of the plans WET stampsd and signed by a California <br />E tr <br />Etr <br />atr <br />atr <br />tstr <br />Etr <br />atr <br />3 <br />4. <br />5. <br />b. <br />7 <br />8 atr <br />o Etr <br />10 ED <br />licensed professional engineer? (including project specmc site plan, pV ta yout, <br />anchorage spacing, anchorage details and manufacturo/s pV suppo formation.) <br />I certify under penalty of periury under the laws of lhe Stale of California above is true: <br />prinl x3ms. TRANG CONG PHAM <br />phone Number: 714 582 3909 <br />Signature: <br />Date: <br />Emait Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />R€v:8/1712015 <br />al <br />/> <br />Project Addiess: