My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20164404 - Permit (2)
PBA
>
Building
>
Permits
>
N
>
Ninth St
>
2106 W Ninth St
>
20164404 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 2:38:30 PM
Creation date
11/21/2022 2:38:28 PM
Metadata
Fields
Template:
Permit
Permit Number
20164404
Full Address
2106 W Ninth St
Permit ID
235210
Master ID Number
2017-139412
Project Name
Miscellaneous Counter1 Permit
Street Number
002106
Street Direction
W
Street Name
Ninth
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
10/18/2017
Issued Date
10/18/2017
Finalized Date
11/8/2017
Flood Zone
X-0602320144J
Description of Work
Install new 3.0 kw roof mounted solar Pv system (11 panels) ALL FEES PAID ON 10194505
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The'information in this guideline is inrended to help local jurisdictions and contractors identify when PV sysrem installations <br />are simple, needing only a basic review and when an installarion is more complex. It is likely that 50%-75% of all residential <br />systems will comply with these simple crireria. For projec6 thal fail to meet the simple criteria. resolution steps have been <br />suggested to provide as a path ro permit approval. <br />lle q uir ed I nJ ortnat i ott J o r f'ermi t : <br />L Site plan showing location of major componenE on the propeny. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a f' perimeter space at ridge and sides may not need separale hre service review. <br />2. Electrical diagram showing PV array confrguration, wiring system, overcurrent protedion, invertec disconnects, <br />required signs, and ac connection to building (see supplied sLandard electrical diagram). <br />3. Specincation sheers and installation manuals (if available) for all manufactured componenG including, bur not <br />limired to, PV modules, inverter(s), combiner box, disconnecrs, and mounting system. <br />Step 1: Structural Review o[ PV Array Mounting System <br />Is the aray to b€ mounted on a detned, permitted mof structuret E Yes f] lto <br />IJ No due to non-compliant rool or a ground mount, submit completed worhsheet Jor the structure wKSl . <br />Roof Information: <br />L Is the roohng type lightweight (Yes = composirion, Iightweight masonry, metal, etc. .)YES <br />I No, submit completed worhsheet lor rool structure wftSI (No = heavy masonry, slate, etc...) <br />2 Does rhe roof have a single roof covering? Elyes flf,lo <br />If No, submit completed worksheet Jor rooJ structure WNSI . <br />3 Provide method and type of weatherproonng roof penetrations (e.9. flashing. caulk)CAULK <br />M ount ing Sy s t ern I nfo r mation <br />l. Is the mounting structure an <br />beneath the module frames? <br />Il No, provide details ol structural attachmcnt certiled W a design professional. <br />2. For manufactured mounting systems, hll out information on the mounting system below <br />a Mounting System Manufacrurer j!M!19[product Name and Model# S}rAPNa O(SERIES l0o{r-; FTASHED L FOOT <br />b. Tolal Weight of PV Modules and Rails 484.7 bs <br />c Total Number of Attachment Point .20 <br />d. weighr per A[achmenr poinr (b * c)31.2 lbs (if grearer rhan 45 lbs, see wKs I ) <br />e Maximum Spacing Between AtEchment Points on a Ra <br />maximum spacing allowed based on maximum design <br />t72 nches (see product manual for <br />f <br />g <br />Toral Surface Area of PV Modules (square feeo 197.7 <br />wind speed) <br />fr? <br />Distributed Weight of PV Module on Roof (b + f)lbs/ft'? <br />IJ distributed weight oJ the PV slstem is greater than 5 lbs/.|e, see WKSI. <br />Step 2 Elect,lcai Re"iew oI PV Sytt"rn (Calculations [or Electrical Diagram) <br />In order for a Pv s)xstem to be considered for an expedited permit process, the following must apply: <br />l. PV modules, urility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverrer <br />3. The rotal inverter capacity has a continuous ac power output 15,440 Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One ofthe standard electrical diagrams(El.l,El.la,El.lb,orEl.lc)canbeusedtoaccuratelyrepresentthePV <br />system. Interactive PDF diagrams are available rL .. .. . r' rr . ( .' - <br />understand eech blank to jll in. lf tlY electrical system is more complex than the standard electrical diagtam t:an efJectivcly <br />2 <br />engineered product designed to mount PV modules with no more than an l8' gap <br />Ev"s Eno
The URL can be used to link to this page
Your browser does not support the video tag.