Laserfiche WebLink
SN <br />ANA <br />IA <br />tl-t\\l$ <br />N[UU]l$ <br />I[tVI <br />0T10 <br />Plannlng E Buildlng Agoncy <br />Building Safety Divislon <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-r9) <br />santa Ana, cA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the ouestions. olan check shall be required. <br />Project Address . 1037 Fairbrook Ln Santa Ana CA 92706 <br />Contractor Company p"r". ParagonSun <br />YES NO Are the following appllcable to the proposed proJect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Vvill the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />I <br />Will the PV array be flush mounted to the existing roof so that lhe plane of the <br />modules (panels) are parallel to the plane of the roof? <br />VMll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2'' minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Vvill the PV system be installed without using any ballasl system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacrng shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including projecl speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 trD <br />2 trtr <br />Etr <br />trtr <br />trtr <br />trtr <br />trtr <br />4 <br />5 <br />6 <br />7 <br />8 Eltr <br />o trtr <br />10 EE <br />lcertify under penalty of perjury under the laws of the State of California that thc abovo i6 true: <br />Phone Number:949-529440'l <br />Email Address: lnfo@psun.us <br />Rev 8117n015 <br />gag 1011612017 <br />Contractor Licenae Number: 1025115 C46 <br />print Name: Erik Larsen Signature: