My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20164593 - Permit (2)
PBA
>
Building
>
Permits
>
R
>
River Ln
>
1125 W River Ln
>
20164593 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 11:10:49 AM
Creation date
11/22/2022 11:10:47 AM
Metadata
Fields
Template:
Permit
Permit Number
20164593
Full Address
1125 W River Ln
Permit ID
236027
Master ID Number
2017-139902
Project Name
Miscellaneous Counter1 Permit
Street Number
001125
Street Direction
W
Street Name
River
Street Suffix
Ln
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
11/14/2017
Issued Date
12/14/2017
Finalized Date
1/5/2018
Flood Zone
AE-0602320144J
Description of Work
Install new 11.7 kw roof mounted solar PV system.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL.SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local jurisdict ions and conlraclors identity when PV syslem inslallarions <br />are simple, needing only a basic review and when an installation is more complex. ll is likely that 50%-75% of all residential <br />systems will comply with these simple criteria. For projects that fail to meet the simple crileria. resolulion sleps have been <br />suggested to provide as a path to permit approval <br />Requireil Information fot Perinit : <br />L Site plan showing location of ma]or components on the property. This drawing need not be exactly lo scale, but it <br />should represent relative location oI components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need seParate nre service review. <br />2. Electrical diagram showing PV array configuration. wiring system. overcurrenl protection, Invertet disconnecls. <br />required signs, and ac conneclion to building (see suPPlied standard eleclrical diagram). <br />3 Specihcarion sheers and insralla(ion manuals (if available) lor all manufactured components including. but not <br />limired ro. PV modules, inverter(s). combiner box, disconnects. and mounting sysrem. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />Is the array to be mounted on a defined. permitted rcof sructure? Eyes Ello <br />U No due to non-contpliant roof or a ground n\ount, submit completed worksheet.for the structure wKSl. <br />Roof Infonnation: <br />I ls rhe roohng type lighlweight (Yes = composition. Iightweight masonry metal, etc...)YES <br />I No, submit completed worksheet Jor rooJ structure wXS, (No = heavy masonry. slate, etc...) <br />2. Does the roof have a single rooF coveringz Eyes E no <br />lf No, submit completed worksheet lor roof structure WKSI. <br />I Provrde method and rype of weatherproofing roof penelralrons (e g flashing. caulk)Flashinq. geocell sealant <br />M ount ing S y s t ern I nf onnat ion : <br />I ls the mounling structure an <br />benealh the module frames? <br />tf No. provide detsils ol st/uctural Lttachment certiled by a design professional. <br />2. For manulactured mounling systems, hll out information on Ihe mounting system below <br />a. Mounting Sy stem Manufaturer ZeP Pro .1cr Name and yo,1"16 Comp Mount Type C <br />b Tolal Weight of PV Modules and Rails 1680.9 lbs <br />d. werghr per Attachment Pornt (b + c) 19.55 lbs(if greater than 45 lbs,seewKsl) <br />e. Maxrmum Spacing Belween Altachment Points on a Rail 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Tolal Surface Area of PV Modules (square feel)701 <br />elr ineered producl designed to mount PV modules with no more than an 18" gap <br />Yes tr No <br />f <br />g <br />lr <br />Distributed Weight of PV Module on Roof (b + i)2.397 lbs/ft <br />IJ distributed weight of the PV system is geater than 5 lbs/fC, see wf\51. <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagrar) <br />ln order for a Pv system to be consider€d for an expedited permit process, the following must apply: <br />l. PV modules, utiltty-interactive inverters, and combiner boxes are identified For use in PV systems. <br />2. The PV array rs composed of 4 series strings or less per inverter. <br />l. The toml inverter capacity has a con(inuous ac power outpul 15,440 watts or less <br />4 The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One ofthe standard electrical diagrams (El. i, El.la, El.lb, or El.lc) can be used to accurately represent the PV <br />system. ln(eractive PDF diagrams are available at www.solarabcs.org/Permirting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant <br />understand each blank to fll in. f the electical system is more complex than the standard electrical diagram can elrectively <br />communicote, provide an alternotive diagram with appropriate detail. <br />2 ExlEDtrED lERMlr PRocEss roR PV sysrEMs <br />c Total Number of Altachment Points 86
The URL can be used to link to this page
Your browser does not support the video tag.