My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165066 - Permit (2)
PBA
>
Building
>
Permits
>
C
>
Camden Pl
>
1928 W Camden Pl
>
20165066 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 11:12:13 AM
Creation date
11/22/2022 11:12:11 AM
Metadata
Fields
Template:
Permit
Permit Number
20165066
Full Address
1928 W Camden Pl
Permit ID
237997
Master ID Number
2018-141142
Project Name
Miscellaneous Counter1 Permit
Street Number
001928
Street Direction
W
Street Name
Camden
Street Suffix
Pl
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/29/2018
Issued Date
1/29/2018
Finalized Date
7/3/2018
Flood Zone
X-0602320257J
Description of Work
Install solar panels/fee pd on 10195402
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U No. s-ubmit completed wothsheet Jot rcof structure WKSI (l!b = heary masonry. slate. etc. .) <br />2 Ooes rhe roof have a single roof coveringz Eves E no <br />Y No, submit completed worhsheet Jor rooJ stn)cture WKSI <br />I Provide merhod and rype of wealherproohng roof penerrations (e.g flashing, callk)flashing <br />M ottnting Sy stefl ryorrrution: <br />I Is the mounting srructure an engineered product designed to mount PV nlodules with no nlore than an l8' gap <br />benearh rhe module frames? Eyes fltlo <br />II No, proid,e detaib oJ structurql attachment certijed by a design prolessional. <br />2. For manufactured mounting systems. hll oul information on the mounting svstem below: <br />a. Mounting Svstern p13nu6oa,r,", EcoFasten Producr \ame and MoLlcl+ Rock it <br />b TJral weishr of Pv Modules 3n6 3211q 712.4 lbs <br />c. Total Number of Attachmenr Poinrs22 <br />d Weight per Arrachmenr Pornr (b + cl 32.4 bs (if grearer lhan 45 lbs, see WKS I ) <br />Maximum Spacing Between Attachment Points on a Rail 48 inches (see product manual tor <br />nraxinrum spacing allowed based on maxrmunl design wind speed) <br />Total Surface Area of PV Modules (square Feet)246.5f <br />g <br />fr' <br />Disrribured Weighr of PV Modr e on Rool (b - f)2.9 r'r :_ <br />If distributed weight oJ the Pv system is greater than 5 lbs/fp. see wKSl . <br />Step 2 Electrical Reuie,, o[ PV System (Calcrlatrons lor Electrical Diagram) <br />In order for a Pv system to be considered for an expedited permit process, the following must apply: <br />I PV modules. utrlir),-'interacrive inverters, and combiner boxes are idenrifred tor usc in PV sysrems. <br />2 The PV arrav rs corrposed of 4 series srnngs or less per inverrer <br />J The total inverter capacity has a conrinuous ac po\,!er output 15.440 Watts or less <br />4 The ac rnrerconnecrion pornr is on rhe load side of senice disconnecring means (690 64rB)) <br />5 One of rhe srandard elecrrrcal diagrams (El I.El.la.El.lb.orEl Icl can be used ro accurarel\.represenr rhe PV <br />s!srem lntcracrive Pf)F diagrams are avallable ar rvuu solarahcs,)rgipermrrfing <br />,r)rrrit)t,irr,-Li:.. frr1.rri. ) .tit.'r.u.Ui\'a drrlqr,?))l !..rrh .lprl"Oirrt,it,.,.lpa.ii/ <br />2 t\ t'tntlt I, l'tllr.i,I ('1.()( [\\ t( )tr l'\ \\\It\t-. <br />EXPEDITED PERNIIT PROCEJ5 FOR SNTALL.SCALE PV S\'\TEIUTS <br />STANDARD STRING S\.5TEI.t <br />The inlormarion in rhis grideline is intended Io help loca I jurisdicrions an(l conrra(:mrs idenlily when PV sylirem insrallations <br />are simple, needrng only a basic revieu and when an installaron is nrore complex. Ir ls llkely that 50 % -75 % of all resldential <br />sysrems will comply with these simple crireria. For projec6 rhat fail to meer rhe simple criteria. resolurion steps have been <br />suggested to provide as a path to permir approval. <br />Required. tnfonnatiott for Permit : <br />I Site plan showing locarion of major components on the properry This drawing need no[ be exacdy co scale. but ir <br />should represent relative location of components at site (see supplied example site plan). Pv arrays on dwellings <br />with a l' perimeter space ar ndge and sides may nor need separate f,re servrce review <br />2 Elecrrical diagram showing PV array confrgurarion, wiring sysrem, overcurrent prorecrion, inverret disconnecrs, <br />requrred signs. and ac connection ro buildrng (see supplied sEndard electrical dragram) <br />3. Speci6carion sheets and installation manuals (if available) for all nranufactured conrponenrs including, but nor <br />Iimlted ao, PV modules, inverLer(s), combiner box, disconnecrs, and mounnng sysrem. <br />Step 1 Structural Review of PV Array Mounting System <br />ls the array to be mounted on a defrned, permitted mof structure? Eyu. Eno <br />U No due to non-complrunr ro<tJ or a ground mount, sLtbmtt complete.l worhshe?r Jor the sftucture wXSl. <br />R@I Infonnation: <br />I Is thr roohn( rvpe liQlrrweight (Yes = corrtrusition. liqhtweiql[ nrasorrrv, nrrral, Frc . )comp shingle
The URL can be used to link to this page
Your browser does not support the video tag.