Laserfiche WebLink
,--SANTA <br />NAJffi <br />Planning & Building Agency <br />Bulldlng Salety Olvision <br />20 Civic Center Plaza <br />P.O. Box '1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist tor Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign tho certification section below. A copy of this form shall be attached to each of TWO sels of plans, of <br />minimum 1l'x 17'size. lf answerinq NOto anvofthe queslions, plan checkshall be requlred. <br />Proiect Address:1230 GOLDENWEST AVE, SANTA ANA, CA92704 <br />SOUTHWEST SUN SOLAR, INC <br />YEs No Are the following appllcablo to the proposed project? <br />E tr Will the PV system layout provide the required threejoot wide clear access pathways <br />per Section 605.11 ofth6 Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV syslam be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof.) <br />Will the PV system w€igh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll lhe PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Wll ths PV system ba installed wilhout using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horlzonlal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project spGcific site plan, PV layout, <br />2 Eltr <br />anchorage spacing, anchorage details and manufaclure/s PV supp orl info <br />I certify under penalty of porjury under the laws of the State of California th bove is true: <br />Print Name:TRANG CONG PHAM Signature <br />phone Number: 714 582 3909 Date: <br />Email Address <br />3 atr <br />Etr <br />Etr <br />4 <br />6 <br />7 <br />8 <br />I <br />Etr <br />AD <br />Etr <br />Etr <br />10. El E <br />8 <br />Rev: 8/1712015 <br />PERMIT@SOUTHWESTSUNSOLAR.CO <br />Conlractor Company Name: <br />r 004667Contractor License Number: