My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165051 - Permit (2)
PBA
>
Building
>
Permits
>
O
>
Oakfield Ave
>
4909 W Oakfield Ave
>
20165051 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 11:12:50 AM
Creation date
11/22/2022 11:12:48 AM
Metadata
Fields
Template:
Permit
Permit Number
20165051
Full Address
4909 W Oakfield Ave
Permit ID
237891
Master ID Number
2018-141059
Project Name
Miscellaneous Counter1 Permit
Street Number
004909
Street Direction
W
Street Name
Oakfield
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/24/2018
Issued Date
1/24/2018
Finalized Date
3/13/2018
Flood Zone
A-0602320143J
Description of Work
Installation of roof mounted PV system. 14 panels, 4.55kw. Worksheet attached to plans. All fees paid on #10195369
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PTRMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations <br />are simple. needing only a basic review and when an installation is more complex. lt is likely that 5O%-75% of all residential <br />systems will comply with these simple criteria. For projects rhat fail to meet the simple criteria. resolution steps have been <br />suggested to provide as a parh to permit approval. <br />Required lt{ormation for Permit: <br />1. Site plan showing location of major components on the property. This drawing need not be exactly to scale. but it <br />should represent relative loca(ion of componenls at site (see supplied example site plan). PV arrays on dwellings <br />with a f perimeter space at ridge and sides may not need separate frre service review. <br />2. Electrical diagram showing PV array connguration, wiring system, overcurrent protection, invertet disconnects. <br />required signs. and ac connection to building (see supplied standard electrical diagram). <br />3. Specihcation sheets and installation manuals (iI available) for all manufactured components including, but not <br />limited to. PV modules. inverter(s), combiner box, disconnects, and mounring system. <br />Step 1 : Structural Review of PV Array Mounting System <br />ls the array to be mounted on a defrned, permitted roof structure?Yes E no <br />I No due to non-compliant rot{ or a grourul mount, submit completed worksheet lor the structure WKSI <br />Roof InJoftnotion: <br />l ls the roohng type lightweight (Yes = composition. lightweight masonry, meEl. etc...)YES <br />ry No. submit completed worksheet for roof sffucture WI(SI (No = heavy masonry, slate. etc. . .) <br />2. Does the roof have a single roof coveringZ ElVes Ino <br />If No, submit completed worksheet ror roof sffucture wKSl . <br />3 Prov,de method and rype of wearherproohng roof penetrations (e.g. flashing. caulk)Flashing, geocell sealant <br />M ount ing Sy st en I nIorfi at i on : <br />I Is the mountinq structure an engrneered producl desrqned to r'nount PV modules wrth no more than an I8" gap <br />benearh lhe mJdule frames? EIv". E r.io <br />If No, provide detaik of sffuctural attachment certifed by a design proJessional. <br />2 For manufactured mounting systems. nll out information on the mounting system below <br />a. Mounting Sy srem Manufacturer ZeP roducr Name and 11466g1X Comp V4 w Flashing-lnsert <br />b Total Werg ht of PV Modules 3n6 P1115 741 lbs <br />c Total Number of Attachment Point 21 <br />d weighr per Attachment Point (b .- c) 35.29 lbs (ii greater than 45 lbs. see wKS I ) <br />e Maximum Spacing Between Attachment Points on a Rail 48 inches (see product manual For <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area of PV Modules (square feet)257 <br />g. Distributed Weight of PV Module on Roof (b -i' l)3.0 lbs/ftl <br />Il distributed weight oJ the PV system ts greater than 5 lbstf , see WKSI. <br />Step 2: Electrical Review o[ PV System (Calculations lor Eleckical Diagram) <br />ln order for a PV system to be considered for an expedited permit pmcess, the following must apply: <br />I PV modules. utility-interactive inverters. and combiner boxes are identihed for use in PV systems. <br />2. The Pv array is composed of 4 series strings or less per inverter. <br />3. The total invefler capacity has a conrinuous ac power ourput 13.440 Watts or less <br />4. The ac interconnect,on point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the standard electrical diagrams (El.l, El.la. El.lb, or El.lc) can be used ro accurately represent the PV <br />system. lnreractive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicanf <br />understand each blank to jU in. If the electrical system is more complex than the standard electrical diagram can elJectively <br />communicdte. provide an alternative diagram with appropriate detail. <br />2 EXPEDITED IERMIT PROCESS FOR PV SYSTEMS
The URL can be used to link to this page
Your browser does not support the video tag.