Laserfiche WebLink
STATE OE CALIFORNIA <br />ALTERATIONS. HVAC <br />CEC.CFlR.ALT{4,E R6v sed 03/15 CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE CFlR-ALT.O4.E <br />Alterations - HVAC CZ 2, and 8-15 (formerly CF-1R-ALT-HVAC)(Page 1of 1) <br />Permitfl <br />5't5 F Hohart St <br />Site Address Enforcement ABency: <br />Santa Ana <br />oate Prepared: <br />2-22-18 <br />New Ducting, P/erums, tinesel <br />Required R-value <br />Conditioned <br />tloor Area (sq tt)ThermostatEquipment Type Equipment Efficiency <br />E Evaporator Coil <br />E Condensing Unit <br />E Compressor <br />E LinesettrV <br />_goyqAFU E <br />-5EERETR <br />HSPT <br />coP O R-6 (CZ 2,8-131Ou.tine <br />O R-8' (CZ 11,14,15) Du.tinr <br />tr R-6 (o// cz'5) Ptenums <br />E R'5 or R7.5) Lineset' <br />Served by system <br />_sqit <br />dsetback <br />(lf not olrcody <br />present, musl <br />be instolled) <br />E Packaged <br />Syttem <br />dSplir System <br />O Mini Splat <br />El Furnace <br />HERS VERIFICATION SUMMARY lnstaller determines work to be completed and matches to one of the option5 below. At permit application this <br />form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filied forms allowed) and a copy left on site. <br />d1. HvAc chanteout/Repair Required Compliance Oocurnents to be left on site for Final <br />cFlR,AtT-02-E <br />CF2R: MECH-01, MECH-20'HERS, MECH-(23 or 24)''HERS, MECH-2s-HERS' <br />CF3Ri MECH'20'HER5, MECH-(23 or 24)-HERS'z, MECH-25-HERST <br />All Equipment, <br />Condenrer unit, Evaporator Coil, <br />Compressor, TXV, Lineset, <br />Air Handler/Furnacer (Can include new ducting) <br />lnst.lle. Require.nent: Duct leakage {115%, or < 10% to outside, or seal all acce5sible leaks), Air Flow a 300 CFM/ton, Refrigerant Charge. <br />Exempted from duct leakage testing if: <br />E 1. Duct system registered with HERS provider as previousiy sealed, or E 2. There is les5 than 40 linear feet of duct in unconditioned space, or <br />E 3. ExistinB duct systems are constructed, in5ulated or sealed with asbestos (list manufacture date of buildint _l <br />E 2. New HVAC System Required Complian.e Oo.uments to be lefl on 5ite tor Final <br />All new equipment and All New Ductsl <br />including Mini Split <br />CFlR.ALT-02.E <br />CF2R: MECH-01, MECH-20-HERS, MECH-22'HERS, MECH-(23 or 24)-HERS'i, MECH-25-HERS' <br />CF3R: MECH'20-HER5, MECH-22-HERS, MECH-(23 or 24)'HERS', MECH'25-HERs'1 <br />Mini Splits require CFlR-ALT-o2-E, CF2R-MECH-01, and (CF2R-CF3R) M€CH'25'HERS <br />lnstalle. Requirement: Duct leakage S 6%, Fan Efficacy (.58w/CfM), Air Flow : 350 CFM/ton (or alternative), RefriSerant Charge <br />E 3 All New Ducts with Replacement Required Compliance Oocuments to be left on site for Final <br />All New Ductss and one or more of the followint <br />replaced : Condenser Unit, Evaporator Coil, <br />Compressor, TXV, tineset, Furnace2 <br />CFlR,ALT-02,E <br />CF2R: MECH-01, MECH-20'HERS, MECH'(23 or 24)-HERS, MECH-25-HERS <br />CF3R: MECH-20-HERS, MECH-(23 or 24)'HER5, MECH-25"HERS <br />lnstaller Requirement: Duct leakate 3 5%, Air Flow 2 350 CFM/ton (or alternative), Refrigerant Charge <br />Exempted from duct leakage testing if: D 1. Existing duct systems are constructed, insulated or sealed with asbestos <br />O 4 New Ductint over 40 feel Required Compliance Documents to be left 06 site tor Final <br />CFlR-ALT-02-E, CF2Rr MECH-20-HER5, CF3R: MECH'20 HERsNew ducting but les5 than All New Ductst <br />lnstaller Required to: Duct leakage (115% or, S10% to outside or, or seal all accessible leak5) <br />tr EXCEPTION: Existing duct systems constructed, insulated or sealed with asbestos <br />IAll new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft rnstalled. Thrs includes in wal15, between floors etc. <br />I Heating only systems and Air Handler/Furnace changes do not require Air Flow MECH'(23 or 24), or Refrigerant Charge verification MECH-25 <br />I All New Ducts is when at least 75 percent of the duct system is new duct material, and up to 25 percent may consist of reused parts from the <br />dwelling unit's existing duct system (e.t., registers, grilles, boots, air handler, coil, plenums, duct material) <br />'R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter <br />with insulation as the followi^91.5-Zr-2y.",2.5-3I-21" ,3.51o 4I-Zh",5I-4%" <br />Contractor (Documentation Author's /Responsible Designer's Declaration Statement) <br />I certit the followint under penalty of perjury, under the laws of the State of Californra. <br />1. The inlormation provided on this Certificate of Compliance it true and correct. <br />2. I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document <br />3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the <br />requirements of Title 24, Parts 1 and 5 of the California Code of Regularions (CCR). <br />4. That the enerW features and performance specifications, materia15, components, and manufactured devices for the buildinB desrgn or <br />system desitn identified on this C€rtificate of Compliance conform to the requirements of Title 24, Part I and Part 6 of the CCR. <br />5. The buildinS desiSn features or system design features identified on th;r Certificate of Compliance are consistent with the information <br />provided on other applicable compliance documents, work5heets, calc!lations, plansind specificataons submitted to the enforcement <br />agency for approval with this building permit application. -4 <br />Re5po.rble 0e5'8ne, Naoe <br />Jane Recktenwald <br />Retponrible De5rgner 5€nalure <br />795556 <br />Greenstar Hnme Servincq 1951 N [r/ain St Oranoe CA 92865 949-88s-0102 <br />For assistance or question5 retardint the Energy Standards, contact the Energy otline at: 1-800-772-3300 <br />I <br />I <br />I