My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10196914 - Permit (2)
PBA
>
Building
>
Permits
>
P
>
Parton St
>
2059 1/2 S Parton St
>
10196914 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 4:18:29 PM
Creation date
11/22/2022 4:18:28 PM
Metadata
Fields
Template:
Permit
Permit Number
10196914
Full Address
2059 1/2 S Parton St
Permit ID
243191
Master ID Number
2017-140292
Project Name
New ADU
Street Number
002059
Partial
1/2
Street Direction
S
Street Name
Parton
Street Suffix
St
Building Use Code
Resid-2 units
Job Types
Revision
Permit Type
Building
Applied Date
7/2/2018
Issued Date
7/30/2018
Finalized Date
11/6/2018
Flood Zone
X-0602320276J
Description of Work
Revision to 10194993. Scope of work changed to reflect new addition of bedroom and bathroom, total of (3) bedrooms and (2) bathrooms. No additional square footage added.
Nature of Work
Revision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
q <br />Project Address: 2059 1/2 S Parton St <br />Assessor's Parcel:015-t 24-09 Lot: 18 <br />Unit Bldg: Address Range Suite Range <br />Zoning: R1Block 6 Tracl 517 Histoflc: No <br />City of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CAg27o2 Building <br />Permit Counter: (7'14) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853 <br />Permit #: lOt96914 <br />Pin #: 79999 <br />Building Use: Single Family Dwelling Occupancy: R-3, U 1st FL Area Patio: <br />Job Type: Revision Constr Type: V B 2nd FL Area T.l.Area: <br />Nature of Work: Revision Code CBC 2016 other Areas yards Req'cl <br />Existing Bldg. & Use: SFD Wdet garage Flood Zone: x-0602320276J carage Area Valuation: <br />Proposed Use: # of Stories: , ,o,r, O <br />Oescription of Work: Revision to '10194993. Scope of work changed to reflect new addition of bedroom and bathroom, total of(3) bedrooms and (2) <br />bathrooms. No additional square footage added. <br />Planning Conditions: <br />Phone: <br />Stale Lic #: <br />Lic Type: <br />Bus. Lic #: <br />Workers' Compensation lnsurance <br />Carrier: <br />Policy #: <br />Expires: <br />oGl DesigAl':h i : 1iri7l <br />lqnacio ClirtarOt ttihY H <br />,/2ti <br />R <br />76 <br />Ef+;819'l KinAd&ibrive <br />nrntinot&ffiUii*y' <br />(zr l) g6l.ld*I5'n' t '""Sge- 7'irt':tit:*r <br />Phone: <br />License #35217 .1,,5 ss 1se1s1 <br />nI sC <br />3t{13002- 57991000- <br />Vrso <br />(:Ci ! ****r ****,r rg 7r:r-E <br />Phone: <br />License # <br />Owner-Builder <br />E ng rneer <br />Address <br />Architect / <br />Desiqner <br />Address: <br />7 /3t1 <br />TrnnOwner: <br />Address <br />Phone: <br />Tenant <br />Jesse Lawler <br />2059 S Parton St <br />Santa Ana, CA 92707 <br />(714) 5024066 <br />lof1 <br />lt:t196911 <br />r:r? Pll <br />i1r{59--( <br />s <br />Planning Approval By: <br />Plan Checked By: <br />Permit lssued By. <br />NPDES lnsp. Req'd. <br />PWA lnsp Req'd: <br />Planning lnsp. Req'd: <br />Landscaping lnsp Req'd <br />Orozco. lvan <br />Chehade, Nabi <br />Zuniga, Allissa <br />Date: 07/30/2018 <br />Date. 07/30/2018 <br />Date: 07/30/2018 <br />Subject to Field: <br />[Iisc. Receipt <br />NIisc. Receipt <br />Misc. Receipt <br />$444.32 <br />$1,459.92 <br />$0.00 <br />Account# <br />71200 <br />Total <br />07776002 53600 Revision <br />37473002 57997 Res. Dev. Fee - S/W <br />07775002 57500 General Plan Update <br />No <br />No <br />Yes <br />No <br />Fire lnsp. Req'd: No <br />Police lnsp. Req'd: No <br />Flood Zone Cerl Req'd No 011 16002 s3600 <br />31413002 5799'1 <br />s444.32 <br />$1,459.92Every pem Esued shall become nvalid unless the wo* on tho site aulhotized by <br />such permlt $ cgmmenced wlhin 180 days altet its issuance.ot if lhe wo* aulhonzecl <br />on lhe sile by such pemit is suspandad or ebandoned for a penocl of 180 days aftor <br />the tifie tho wot* is commenced <br />lnspector MtD# 2017-140292 <br />Fee Totat <br />Pard to Date: <br />Balance Due; <br />$1,904.24 <br />$444 32 <br />$1,459.92 <br />Conlractor <br />Address:
The URL can be used to link to this page
Your browser does not support the video tag.