My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165475 - Permit (2)
PBA
>
Building
>
Permits
>
G
>
Gates St
>
714 S Gates St
>
20165475 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 10:23:23 AM
Creation date
11/23/2022 10:20:12 AM
Metadata
Fields
Template:
Permit
Permit Number
20165475
Full Address
714 S Gates St
Permit ID
239854
Master ID Number
2018-142266
Project Name
Miscellaneous Counter1 Permit
Street Number
000714
Street Direction
S
Street Name
Gates
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
3/27/2018
Issued Date
3/27/2018
Finalized Date
5/17/2018
Flood Zone
X-0602320256J
Description of Work
Install (14) roof mounted solar panels. Fees paid on 10195947.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PRoCESS FoR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The lnformation in this guideline is intended to help local Jurisdictions and contractors identiS/ when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. lt is likely that 50 % -75% of all residential <br />sy$ems will comply with these simple criteria. For projecls that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Requlred InJonnation lor Permit: <br />1 Site plan showing location of major components on the property. This drawing need not be exacdy to scale, but it <br />should represent relative location of components at sire (see supplied example site plan). Pv arrays on dwellings <br />with a 5' perimeter space at ridge and sides may not need separate hre service review. <br />2. Electrical diagram showing Pv array conhguration. wiring sysrem, overcurrent protection, inverter, disconnecrs, <br />required signs, and ac connection ro building (see supplied srandard elecrical diagram). <br />3. Specification sheets and installation manuals (if available) for all manufactured components including. but nor <br />limited to, Pv modules, invefter(s), combiner box, disconnecls, and mounting system. <br />Step 1 : Structural Reuie- of PV Array Mounting System <br />ts the array to be mounted on a deEned, permltted rcof strucnft? EYes ENo <br />t No due to non-compliant rooJ or a ground mount, bmit completed vorhsheet Jot the structure wKSl. <br />Roof Infonnation: <br />If No, submit completed worksheet for roof stucture WI(S, (No = heavy masonry, slate etc. . .) <br />2. Does rhe roof have a single roof coveringf Elves !no <br />Ij No, submit completed. worksheet lor roof structure WNS L <br />5. Provide method and type of wearherproofing roof penerrations (e.g. flashing, caulk)Flashinq & M1-Sealant <br />M oM t ing S y s t em lflfonnat i on : <br />| . Is the mounting structure an engineered producr designed ro mount PV modules wirh no more rhan an I 8 ' gap <br />beneath the module frames? pl ves l-l no <br />IJ No, prwide details of structural attachment certifed W a design Wlessional . <br />2. For manufactured mounting systems, fill out information on the mounting system below: <br />a <br />b <br />c <br />d <br />e <br />Mounring System yunu6ualu,s1 Everest producr Name and Modet# Everest 48-X Support Bail <br />Total Weigh t of PV Modules .n6 P6115 650 bs <br />Total Number of Atrachment Points20 <br />Weight per Artachment Point (b + c)32.5 lbs (if greater than 45 lbs. see WKS I ) <br />Maximum Spacing Between Aftachment Points on a Rail 04 nches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. <br />g <br />Total Surface Area of PV Modules (square feet)612 f[ <br />Distributed Weight of Pv Module on Roof (b + f)1 .06 lbs/ftl <br />If distibuted wetght oJ the PV system is gwter thm 5 lbdJf , see WKS 1 . <br />Step 2: Electrical Reuie* o[ PV System (Calculations lor Electrical Diagram) <br />In oder for a Pv qEt€m to be considercd for an orpedlted permit pmcess, the fiouowing mtlst appbr <br />l. PV modules, utility-interactive inverters, and combiner boxes are identined for use in Pv systems. <br />2. The Pv array is composed of 4 series strings or less per inve(er <br />5. The tota.l invefter capacity has a continuous ac power output 15,440 watts or less <br />4. The ac interconnecdon point is on the load side of service disconnecdng means (690.64(8)). <br />5. Oneof the $andard electrical diagrams (E|.1, El .la,El.lb,orEl.lc)canbeusedtoaccuratelyrepresenrthePV <br />system. lnteractive PDF diagrams are available at wwwsolarabcs.org/perm ifting. <br />Fll[ out the standard electrical diagram completely A guide to the e[ectrical diagram is provided to help the applicant <br />understand each blank to fll in I tle electrical system is more complex than the standnrd electrical diagram can efrectivel) <br />communicate, provide an alternative diag'am with appropriate detail. <br />2 Ext'EDlrED PERMIT PRocEss [oR PV sysrrMs <br />I . Is the roofrng type lightweight (Yes - composition, lightweight masonry, metal, erc...; Yes - Comp Shingle
The URL can be used to link to this page
Your browser does not support the video tag.