Laserfiche WebLink
Plrnning & Bullding Agsncy <br />Bullding S.fcty Dlvl!lon <br />20 Clvlc Conter Plaza <br />P.O. Box 1988 (M.19) <br />Srnt! Ana, CA 92702 <br />(7r4) 647-5800 <br />www,santa€na.otg <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />- <br />sol-01 csc 2013 <br />Solar Photovoltalc (PV) Checklist for Dotached STNGLE FAMtLy RESTDENCES Onty <br />lnstrua{lon3: The licensed contractor of rocord shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of thls form shall be attachod to sach of TWO sets of plans, of <br />minimum 11" x 17' <br />Prolecl Addrsss: <br />size. Jf answerin NO to any of lhe ns, Dlan check shall b€required. <br />,I 117 S. HALLADAY ST, SANTA ANA, CA92701 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />YES NO Are tho followlng appllcable to lhe proporod projoct? <br />Will lhe PV system layout provkJe th€ requirsd thres-foot wids clear accass pathways <br />per Section 605.11 of the Califomia Fire Cods, and is this shown on the roof plan? <br />Will the PV systsm be installed on a roof having only one rooting layer with no <br />overlays? <br />Will the PV anay b€ llush mounted to the exlsting roof so thal the plane of the <br />modules (panels) are parallel to tha plane of the roon <br />Will tho PV system weigh maximum 4 pounds per squsre feet or lass? <br />Will ths PV systam be installsd whero the modulos do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will th6 PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surfac€ of the roof? <br />Will the PV system be installed without uslng any ballast system or counter-weight <br />systsm? <br />Will the Bnchors be instralled with a maximum hodzontal anchor spacing of 6 feet <br />and ls this maximum horizontal spacing shown on ths plans? <br />Will lhe minimum 5/16'lag screws be installsd wlth a minlmum ol2-112inch <br />embsdmsnt into rool rafiers (with prs-drilled holes) and is this minimum embedmenl <br />shown on the plans? <br />Are ALL the slruciural pages of the plans WET stamped and signod by a California <br />licensed pmfesslonal engineer? (includlng proJect specific site plan, pV layout, <br />a tr <br />2 atr <br />atr <br />Etr <br />Ettr <br />trD <br />trtr <br />J <br />4 <br />5 <br />6 <br />7 <br />8 Ertr <br />s EO <br />'10 ED <br />anchorage spacing, anchorage delails and manufacturer's PV support i ation.) <br />I certffy undor pcnalty of perlury under the laws of the Stata <br />pd61 113mg. TRANG CONG PHAM g;r..1, <br />of Califomls thd <br />rg: <br />bove iE true: <br />phona Number: 714 582 3909 Date: <br />Email Address: <br />Rov:8/1712015 <br />PERMIT@SOUTHWESTSUNSOLAR.COM <br />3 tg <br />I