Laserfiche WebLink
,,,,'SANTA <br />NA <br />tll\\[6 <br />& Bllt0t\c <br />Act\cl <br />Planning & Building Agency <br />Building Safety Division <br />20 Civlc Center Plaza <br />P.O. Box'1988 (M-19) <br />Santa Ana, CA927O2 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENT!AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{1 cBC 2013 <br />Solar Photovoltaic (PV, Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contraclor of record shall fill in the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the cerlification section <br />"lf ansrlEring NO to any ofthe questions, plan check shall be required." <br />Project Address:2OO9 SOUTH HALLADAY STREET SANTA ANA. CA 92707 <br />contractor License Number. # 1008302 <br />2 <br />3 <br />4 <br />s Eltr9 Etr <br />10 EIE <br />YES NOtrtr <br />Etrtrtr <br />trtr <br />atr <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to the existing roof so thal the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maximum 3 pounds per square feet or less? <br />Wll the PV system be installed where lhe modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\Mll the PV system be installed with a space of 2' minimum to 10' maximum between <br />the underside of modules and lhe surface of the roof? <br />\Mll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Vvill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Vvill the PV system layout provide a three-foot wide clear access pathway per lhe <br />latest edition of 'Guideline tor Fire Satety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on lhe OCFA website: hllor//www. ocfa.oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ot 2-112 inch lag screw embedment into roof raflers? <br />Are ALL the strudural pages of the plans WET stamped and signed by a Califomia <br />lic€nsed professional engineel? (including projecl specilic site plan, PV layout, <br />anchorage spacing, anchorage details and manufadureis PV support information.) <br />6 <br />7 <br />Btr <br />trtr <br />I certify under penalty of pedury underthe laws of the State of Califomia that the above is true: <br />print name: JULIO FLORES Signatu re <br />Phone Number: <br />Email Address: <br />Re'l:2117DO15 <br />(7 r4\ 370-8877 Date: 2l 20r8 <br />Contractor Company Name: STAR SUN SOLAR