My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10195796 - Permit (2)
PBA
>
Building
>
Permits
>
H
>
Hall Ave
>
2609 W Hall Ave
>
10195796 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 10:28:56 AM
Creation date
11/23/2022 10:28:55 AM
Metadata
Fields
Template:
Permit
Permit Number
10195796
Full Address
2609 W Hall Ave
Permit ID
239271
Master ID Number
2018-141931
Project Name
Miscellaneous Counter1 Permit
Street Number
002609
Street Direction
W
Street Name
Hall
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
3/7/2018
Issued Date
3/7/2018
Finalized Date
4/4/2018
Flood Zone
X-0602320259J
Description of Work
Install new 4.83 kw roof mounted solar PV system (14 panels) Per PV checklist.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sol{1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall ,ill in the address of the prolect, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certific€taon section <br />"lf ansu/ering NO to any of the questions, plan check shall be required." <br />Project Address:2609 WEST HALL AVENUE SANTA ANA, CA 92704 <br />Contractor Company Name:STAR SUN SOLAR <br />Contractor License Number: f 1008302 <br />1 tr <br />tr <br />tr <br />tr <br />9B <br />10B <br />YES NO <br />tr <br />Are the following applicable to the proposed project? <br />Vvillthe PV anay be flush mounled to the existing roofso that the plane ofthe <br />modules (panels) are parallel to the plane of the roof? <br />VMll the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overtlang any roof edges <br />(such as eaves, gabled ends, rirlges and hips)? <br />Wll the PV system be installed with a space of 2" minimum lo '10' maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballasl system or counter-weight <br />system? <br />\Mll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />VMll lhe PV system layout provide a lhree-foot wide clear access pathway per the <br />latest edition of 'Guideline for Fire Satety Elements of Solar Photovoltaic Syslems" <br />2 <br />x <br />8 <br />Etr <br />by OCFA? (Guideline available on the OCFA website: http://www ocfa orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feel? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof raners? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineen (including pmject specific sile plan, PV layout, <br />anchorage spacing, anchorage details and manufadurefs PV support information.) <br />I certify under penalty of perjury under the laws of the State of Califomia that the above is true: <br />trtr <br />x <br />tru <br />sisnature: fu44-. <br />Dare: 3l6lZ0W uPhone Number: <br />Email Address <br />,,,SANIA <br />NA-"HH <br />\ <br />x <br />Rev:2h712015 <br />Planning & Buil6ing Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />4. <br />5. <br />6. <br />7. <br />tr <br />tr <br />tr <br />Print name: CATHY LY
The URL can be used to link to this page
Your browser does not support the video tag.