My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20165534 - Permit
PBA
>
Building
>
Permits
>
R
>
Riverside Dr
>
2432 N Riverside Dr
>
20165534 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 11:26:05 AM
Creation date
11/23/2022 11:26:04 AM
Metadata
Fields
Template:
Permit
Permit Number
20165534
Full Address
2432 N Riverside Dr
Permit ID
240054
Master ID Number
2018-142341
Project Name
Schneider PV System
Street Number
002432
Street Direction
N
Street Name
Riverside
Street Suffix
Dr
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
3/30/2018
Issued Date
3/30/2018
Finalized Date
6/25/2018
Flood Zone
AE-0602320163J
Description of Work
Install (16) roof mounted solar panels. FEES PD ON 10196010
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*,,SANTA <br />NA,'flffi <br />Planning & Bulldlng Agsncy <br />Bullding Safoty Olvision <br />20 Civic Contor Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www,sanla-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />9CY\1\-( t Cr'-tl' <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAintLY RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contracto/s <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the questions, plan check shall be requirod.* <br />Project Address: <br />Contractor Company Name: fi\Off\€ nf\ \fn t(J\fAy. <br />contractor Ltcense Number: I tlf,VAVU <br />q <br />YES NO Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of lhe roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout prov ide a three-foot r access pathway per the <br />latest edition ol "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including pro.iect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />,, Ptr,co <br />3 EPtr <br />4 Eitr <br />UPtr <br />UPtr <br />?Eftr <br />tr <br />tr <br />D <br />p <br />EI- <br />EI, <br />8 <br />9 <br />10 <br />I certlfy under penalty of perrury under the laws of the State ot Cal la that the abov6-ls <br />Print name: fJYfrur trn lfp r Signature <br />Phone Number: M)-'Qb' ql qa Date <br />I r <br />Rev:2J1712015 <br />Email Address:a 9.
The URL can be used to link to this page
Your browser does not support the video tag.