My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10195779 - Permit (2)
PBA
>
Building
>
Permits
>
W
>
Wright St
>
2118 N Wright St
>
10195779 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2022 11:27:30 AM
Creation date
11/23/2022 11:27:29 AM
Metadata
Fields
Template:
Permit
Permit Number
10195779
Full Address
2118 N Wright St
Permit ID
239211
Master ID Number
2018-141903
Project Name
Miscellaneous Counter1 Permit
Street Number
002118
Street Direction
N
Street Name
Wright
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
3/6/2018
Issued Date
3/6/2018
Finalized Date
4/4/2018
Flood Zone
X-0602320163J
Description of Work
Install new 8.28 kw roof mounted solar PV system (23 panels) Per PV checklist
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANIA <br />tll\\\, <br />r u lLt)lv <br />lt,t{lANA <br />fl]t0l <br />Planning E Bullding Agency <br />Buildlng Sstuty Olvl!lon <br />20 Clvlc Conbr Plsz8 <br />P.O. Box 1988 (m-10) <br />S.ntr Ana, CA 92702 <br />(71/t) 647€800 <br />tYww.3anta{na.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />sor_41 cBc 2013 <br />Solar Photovoltaic (PV) Chocklirt for Detached SINGLE FAmILY RESIDENCES Only <br />lnstruction!: The licensed contraclor of record shall fill in the address of the project, contradofs <br />licensing intormation and answer questions 1 -10 below. Complete and sign the certification seclion-lf anrrverlng NO to any of the quertioru, plen check rhrll be required.* <br />Project Addras!:2I 18 NORTH WRIGHT STREET SANTA ANA, CA 92705 <br />Conbactor Company Name:STAR SUN SOLAR <br />Contractor Licenre Number:# 1008302 <br />1 <br />YES NO <br />Eltr <br />Eltr <br />81 tr <br />6tr <br />81 tr <br />2 <br />3 <br />Aro tho followlng appllceblo to tho propced project? <br />\Mll the PV array b€ f,ush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roon <br />\Mll the PV system weigh nnximum 3 poundg per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as ea\€s, gEbled ands, ridges and hips)? <br />\Mll the PV system be installed with a space of 2" minimum to 10' maximum between <br />the undeBid€ of rnodules and the surfacs of the roof? <br />Wll the PV syst€m be installed without using any ballast systBm or counter-weight <br />system? <br />Wll the PV Bystem be installed on a roof having only one roofing layer with no <br />overlays? <br />Wll the PV system layout provide a thre€-foot wide clear Ercess pathway p€f the <br />latest edition ol "Guideline for Fire Safety Hements of Sotar Photovoltaic Systoms' <br />by OCFA? (Guideline available on the OCFA website: htto:/,'www ocfa orq) <br />Do the plans show a maximum horizontal enchor spacing of 6 feet? <br />Do the plans sho/v a minimum of 2-112 inch lag screw ambedrnent into roof rafrers? <br />Are ALL the structural pages of the plans \ /ET stamped and signed by a Califumia <br />licensed professional engine€A (including project specific sit€ plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />6 8lD <br />4 <br />8. Etr9 Etr <br />10.EE <br />7 Eltr <br />I certlfy undor pen.lty of porjury under tho l.w. of the Stato of Crlltornla thtt tho rbove l. tru.: <br />print narne: SARAT SORN Signature Sa,,"atSrrn <br />Phone Number:Date: 03/03/2018 <br />Email Address: <br />Rev:211712015
The URL can be used to link to this page
Your browser does not support the video tag.