My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10196307 - Permit (2)
PBA
>
Building
>
Permits
>
T
>
Towner St
>
2621 S Towner St
>
10196307 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 9:39:38 AM
Creation date
11/28/2022 9:39:37 AM
Metadata
Fields
Template:
Permit
Permit Number
10196307
Full Address
2621 S Towner St
Permit ID
241098
Master ID Number
2018-143068
Project Name
Miscellaneous Counter1 Permit
Street Number
002621
Street Direction
S
Street Name
Towner
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
4/30/2018
Issued Date
4/30/2018
Finalized Date
5/17/2018
Flood Zone
X-0602320259J
Description of Work
Installation of roof mounted PV system. 10 panels, 2.328kw system.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,-,'SANTA <br />NA,',il'i,il$ <br />Planning & Building Agsflcy <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol,01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall flll in the address of the project, contractois <br />licensing information and answer questions 1 -10 below. Complete and sign the certafication section*lf answering NO to any of the questions, plan check shall be required." <br />Projec tAddress: 2621 SOUTH TOWNER STREET SANTA ANA, CA92707 <br />Contractor Company Name: <br />Contractor License Numbea: <br />trtr <br />Etr <br />I certify under <br />Print name: <br />2 <br />3 <br />P G S SOI-AR <br />#r025r ls (c-46) <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a thresfoot wide clear access pathway per the <br />latest edition ol "Guideline for Fke Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htlo://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol2-112inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Ity of perjury under the laws of the State of Califo that th above is true: <br />Phone Number q€/ zs? s654 <br />Signature: <br />Date: <br />Email Address <br />YES NOtrtr <br />Eltrtrtr <br />trtr <br />trtr <br />4 <br />5 <br />6 <br />7 <br />8 Eltre Eltr <br />10 EIE <br />Re\r:211712015 <br />/L/4
The URL can be used to link to this page
Your browser does not support the video tag.