Laserfiche WebLink
,*-SNTA <br />NAJ}ffiffi <br />Planning & Building Agencj <br />Building Safety Division <br />20 Civic Cenler Plaza <br />P.O. Bor 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 c8c 2013 <br />Solai Photovoltaic (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the Ouestions. D lan check shall be reouired. <br />Project Address:1322 N. OLIVE ST, SANTA ANA, CA 92706 <br />Contraclor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />YES NO <br />B tr <br />Eltr <br />9. Etr <br />10.EE <br />4 <br />5 <br />2 <br />3 <br />6 <br />7 <br />Eltr <br />Ettr <br />Ettr <br />Etr <br />Etr <br />&tr <br />ayo <br />tion.) <br />I certify under penalty of periury under the laws of the State of California t <br />licensed professional engineer? (including project specifrc site plan, PV I <br />anchorage spacing, anchorage details and manufacture/s PV support in <br />p1;n1 1i13mg. TRANG CONG PHAIi'l <br />phone Number: 7'14 582 3909 <br />Signature <br />Date: <br />Emait Address: PERM lT@SOUTHWESTSUNSOLAR.COM <br />Revi 8/1712015 <br />the is true: <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the exisling roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV syslem be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o12-112inch <br />embedmenl into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the strucfural pages of the plans WET stamped and signed by a Califomia