Laserfiche WebLink
Planning & Bulldlng Agency <br />Building Safety Division <br />20 Civic Center Plaza . i <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www,santa-ana.org <br />sol-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11' x 17" size. <br />Project Address:Lltt Qonco.J s+ <br />contraclor Company ttame: Vivint Solar <br />contracior License Number: 9737 56 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />du <br />sftr <br />4 <br />ro€E <br />I certify under penalty of perjury under the laws of tho State of <br />printr.rame: anlstiu+ {remrw Sisnarure: <br />California that the abovo is true: <br />phone Number: 562-942-1270 <br />Emait Address: noem i. pa rra@vivintsola r. com <br />oa", 6-,j-lB <br />Rev: 8/17120T5 <br />*-SANTA <br />NAW <br />, E5 <br />, dg <br />s f,tr <br />u UD <br />, €tr <br />u €tr <br />n {o <br />Are the followlng appllcablo to the proposed proiect? <br />Will the PV system layout provide the required three-loot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounled to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV syslem weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10' maximum between <br />the underside of modules and the surfuce of the roof? <br />Will the PV siqtem be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be'lhstalled with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.)